Identifying and Categorizing Risks Incumbent in US Nuclear Power Plant Construction

2021 ◽  
Vol 147 (4) ◽  
pp. 04021024
Author(s):  
Rachael Sherman ◽  
Kristen Parrish ◽  
Anthony Lamanna
2016 ◽  
Vol 2016 ◽  
pp. 1-9 ◽  
Author(s):  
Shang-Kuan Chen ◽  
Yen-Wu Ti ◽  
Kuo-Yu Tsai

In nuclear power plant construction scheduling, a project is generally defined by its dependent preparation time, the time required for construction, and its reactor installation time. The issues of multiple construction teams and multiple reactor installation teams are considered. In this paper, a hierarchical particle swarm optimization algorithm is proposed to solve the nuclear power plant construction scheduling problem and minimize the occurrence of projects failing to achieve deliverables within applicable due times and deadlines.


Author(s):  
Kenji Akagi ◽  
Masayuki Ishiwata ◽  
Kenji Araki ◽  
Jun-Ichi Kawahata

In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and general versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described.


Author(s):  
Taihei Yotsuya ◽  
Kouichi Murayama ◽  
Jun Miura ◽  
Akira Nakajima ◽  
Junichi Kawahata

A composite module construction method is to be examined reflecting one of the elements of construction rationalization of a future nuclear plant planned by Hitachi. This concept is based on accomplishments and many successes achieved by Hitachi through application of the modular construction method to nuclear power plant construction over 20 years. The feature of the composite module typically includes a planned civil structure, such as a wall, a floor, and a post, representing modular components. In this way, an increased level of rationalization is expected in the conventional large-scale nuclear plants. Furthermore, the concept aiming at the modularization of all the building parts comprising medium- or small-scale reactors is also to be examined. Additional aims include improved reductions in the construction duration and rationalization through use of the composite module. On the other hand, present circumstances in nuclear plant construction are very pressing because of economic pressures. With this in mind, Hitachi is pursuing additional research into the introduction of drastic construction rationalization, such as the composite module. This concept is one of the keys to successful future plant construction, faced with such a severe situation.


1977 ◽  
Author(s):  
G.E. Mason ◽  
R.E. Larew ◽  
J.D. Borcherding ◽  
S.R. Jr. Okes ◽  
P.F. Rad

Author(s):  
E. Çolak ◽  
M. Chandra ◽  
F. Sunar

Abstract. Recently, the demand for nuclear power plants has been increasing in developing countries in line with global energy demands. Turkey, one of the developing economies, is also making plans for nuclear power generation since 1970. The Sinop Nuclear Power Plant was a planned nuclear plant located in the Turkey's most northern point in an area where 99% of the land is forest, in Sinop Peninsula. If disputes are resolved and its construction continues, the plant is expected to be put into service in 2028. On the other hand, due to the construction of the nuclear power plant, the land cover in and around the plant site has changed, potentially causing major environmental changes. As an example, more than 650000 trees have been cut down so far for the construction of a nuclear power plant, which may have a negative impact on the region's ecological balances by endangering biodiversity and causing ecological damage. The aim of this study is to detect changes in forest areas from the start of nuclear power plant construction through December 2020 using Sentinel 1 SAR and Sentinel 2 optical time series images. For this purpose, different radar and optical vegetation indices such as Modified Radar Vegetation Index (mRVI), Modified Radar Forest Degradation Index (mRFDI), and Normalized Difference Vegetation Index (NDVI) were applied using Google Earth Engine (GEE) Sentinel 1/2 satellite time series for 2015–2020 period. As a result, the indices used were found to yield findings consistent with the reported negative land cover change. In addition, correlation analysis were made between the radar vegetation indices used and a very high negative correlation (−0.99) was found. The annual distributions of the values of the three indices used were statistically evaluated using boxplots.


Sign in / Sign up

Export Citation Format

Share Document