BIM’s Formal and Informal Collaborative Networks in Traditional Procurement: Insights from the Construction Phase of a Hospital Case Study
2021 ◽
Vol 37
(6)
◽
pp. 05021008
2015 ◽
Vol 9
(2)
◽
Keyword(s):
2012 ◽
Vol 94
(4)
◽
pp. e24-1-6
◽
2019 ◽
Vol 36
◽
pp. 100535
◽
1998 ◽
Vol 1
(4)
◽
pp. 417-435
2013 ◽
Vol 26
(11)
◽
pp. 1066-1086
◽
Keyword(s):
2017 ◽
Vol 122
◽
pp. 139-150
◽