Modeling Information Dependencies in Construction Project Network Organizations

Author(s):  
Mehmet Koray Pekericli ◽  
Burcu Akinci ◽  
Itir Karaesmen
Author(s):  
David Cross ◽  
Juani Swart

Abstract In this paper, we highlight the networked context of the professions. In particular, we indicate that neo-classical professionals tend to work across organizational boundaries in project teams, often to meet the needs of clients and the wider society. However, little is known about the resources that professionals draw on to meet immediate, fast paced, client demands in project network organizations (PNOs). We pinpoint how knowledge resources, human, social and organizational capital enable professionals to produce outputs at a fast pace/tempo. Temporality emerged as an unexpected but key issue in our empirical research and we explore this further here. First, we put forward how professional work organization(s) has changed by focusing on the boundaries of organizations, and how this is often temporary and project-driven. Second, we use the specific lens of knowledge resources which are drawn upon to enable networked working and ask the question: which knowledge resources enable professionals to work at a fast pace within networks? Third, appreciative of the vast literature on temporary and networked organizations in professional work, our focus is beyond a single profession or organization, and hence, we build upon the prior research on PNOs. We do this by drawing on empirical data of a humanitarian aid project networked organization (HN) that upscales across its network at high speed, often within days, to generate funds for humanitarian disasters in order to save lives.


2013 ◽  
Vol 431 ◽  
pp. 365-369
Author(s):  
Bi Lin Shao ◽  
Li Qing Wang ◽  
Qiong Wu

According to the characteristics of construction project, it set the third level of duration implicit cost, deepening the understanding of the duration implicit cost in construction project. Through analyzing the similar characteristics of the technique of project network diagram and neural network, it built a duration implicit cost control model based on neural network, which can adjust the project network diagram to the optimization direction. Aiming at the defects of the traditional neural network, the variable learning rate back-propagation arithmetic and the additional momentum method were introduced, and the duration implicit cost control model was built, improving the accuracy of the control for the neural network technique.


Sign in / Sign up

Export Citation Format

Share Document