Extending capacity planning by positive lead times and optional overtime, earliness and tardiness for effective master production scheduling
2008 ◽
Vol 46
(12)
◽
pp. 3359-3386
◽
1992 ◽
Vol 3
(4)
◽
pp. 16-22
◽
Keyword(s):
Research on Production Scheduling Method and the Application in Switch Machine Production Enterprise
2012 ◽
Vol 190-191
◽
pp. 156-159
2007 ◽
Vol 45
(12)
◽
pp. 2629-2653
◽
2006 ◽
Vol 23
(3)
◽
pp. 245-252
◽