A tabu search algorithm with solution space partition and repairing procedure for cyclic robotic cell scheduling problem

2012 ◽  
Vol 50 (22) ◽  
pp. 6403-6418 ◽  
Author(s):  
Pengyu Yan ◽  
Ada Che ◽  
Naiding Yang ◽  
Chengbin Chu
2021 ◽  
Vol 11 (5) ◽  
pp. 2069
Author(s):  
Mariusz Uchroński

In this paper, the weighted tardiness single-machine scheduling problem is considered. To solve it an approximate (tabu search) algorithm, which works by improving the current solution by searching the neighborhood, is used. Methods of eliminating bad solutions from the neighborhood (the so-called block elimination properties) were also presented and implemented in the algorithm. Blocks allow a significant shortening of the process of searching the neighborhood generated by insert type moves. The designed parallel tabu search algorithm was implemented using the MPI (Message Passing Interface) library. The obtained speedups are very large (over 60,000×) and superlinear. This may be a sign that the parallel algorithm is superior to the sequential one as the sequential algorithm is not able to effectively search the solution space for the problem under consideration. Only the introduction of diversification process through parallelization can provide an adequate coverage of the entire search process. The current methods of parallelization of metaheuristics give a speedup which strongly depends on the problem’s instances, rarely greater than number of used parallel processors. The method proposed here allows the obtaining of huge speedup values (over 60,000×), but only when so-called blocks are used. The above-mentioned speedup values can be obtained on high performance computing infrastructures such as clusters with the use of MPI library.


2009 ◽  
Vol 26 (06) ◽  
pp. 817-829 ◽  
Author(s):  
XIAOFENG HU ◽  
JINGSONG BAO ◽  
YE JIN

This paper focuses on scheduling problem of a pipe-processing flowshop in a shipyard. The flowshop composes of five stages, including cutting, bending, welding preprocessing, argon-welding and CO 2-welding, and each stage consists of identical parallel machines. Since thousands of pipes are mounted on the hull block before erection, the pipe-processing scheduling is a critical task for shipbuilding to meet the due date of the block erection. A tabu search algorithm is developed for the scheduling problem with the objective of minimizing total tardiness. Computational experiments are performed on the collected real data. Results show that the proposed algorithm is efficient for this problem.


Sign in / Sign up

Export Citation Format

Share Document