A simplified approach to the planning and control of cost and project duration

1985 ◽  
Vol 3 (3) ◽  
pp. 183-198 ◽  
Author(s):  
M. M. Cusack
2012 ◽  
Vol 58 (No. 2) ◽  
pp. 72-84 ◽  
Author(s):  
H. Štiková

The fuzzy approach to the project network analysis of the project planning and control is commonly oriented on the fuzzy critical path setting and the project duration monitoring. In the article, this approach is improved by the addition of the project costs perspective to the standard time aspect. The relations for the fuzzy quantity of the total project costs and for its membership function are derived. The example demonstrates the application of the theoretical relations and shows how the enhanced fuzzy approach can be used when different project variants are to be compared. The example also reveals how the fuzzy approach with the project costs monitoring brings new information for the project planning and management and for the risk management.  


2018 ◽  
Vol 192 ◽  
pp. 01027 ◽  
Author(s):  
Paing Hein Soe ◽  
Thein Min Htike

Project scheduling is an important task in project management which monitors the project duration, resource utilization and affects the benefit of project for all kinds of project such as construction, IT, renewable energy, product design and manufacturing etc. Among many methods for project management, critical path method (CPM) is one of the better-known planning and control techniques in project scheduling. In this study, CPM-based computerized program was developed together with modeling of step by step calculations of parameters of interest such as earliest starts and finishes, slack and float times of project activities resulting in determination of critical path for the project. One advantage of computer implementation of CPM using MATLAB in this study is that unlike conventional method, it eliminates necessity to conventionally draw network diagram to perform critical path analysis.


Author(s):  
D.L. Roke

The growth in horticultural and some industrial development in selected areas of Northland has led to a need for more specific and careful planning and control of limited resources in a number of major catchments. The potential irrigation demands for horhculture comprise over 60% of Northland's potential water requirements. By contrast, farm water supply needs are only 11% of these needs. Because of their importance to the Northland economy, and in the legislation these needs are given a high priority in water resource management planning. Land uses, including pastoral farming, require careful operation to reduce diffuse sources of pollution.


Soviet Review ◽  
1973 ◽  
Vol 14 (2) ◽  
pp. 24-38 ◽  
Author(s):  
N. Fedorenko ◽  
K. Gofman