Environmental Impact Analysis Using Hybrid Decision Support Framework: A Transportation Project Case Study

Author(s):  
Mohamed El-Gafy ◽  
Tariq Abdelhamid ◽  
Yassir AbdelRazig
2018 ◽  
pp. 1318-1336
Author(s):  
Martina Huemann ◽  
Claudia Ringhofer

The chapter describes the importance of balancing risk reduction and “taken risks” and what role a holistic risk identification plays in the context of Sustainable Development (SD). It provides a theoretical background on SD, Risk Management and the Environmental Impact Analysis (EIA). It discusses the implementation of SD in the EIA as one example for a holistic risk identification. The link between SD and risk management is discussed and the identified learning potentials for further developing traditional risk identification methods are explained. A risk identification explicitly considering SD as well as considering project and stakeholder risks is presented within a case study. The case study project is Engineering, Procurement and Construction (EPC) of a wind park farm in Brazil from the supplier perspective. Based on SD both, the risks of the project as well as the risks of the project stakeholders are considered. Whereby the chapter shares the risk identification as such as well as the process for which a systemic board constellation was applied.


Author(s):  
Martina Huemann ◽  
Claudia Ringhofer

The chapter describes the importance of balancing risk reduction and “taken risks” and what role a holistic risk identification plays in the context of Sustainable Development (SD). It provides a theoretical background on SD, Risk Management and the Environmental Impact Analysis (EIA). It discusses the implementation of SD in the EIA as one example for a holistic risk identification. The link between SD and risk management is discussed and the identified learning potentials for further developing traditional risk identification methods are explained. A risk identification explicitly considering SD as well as considering project and stakeholder risks is presented within a case study. The case study project is Engineering, Procurement and Construction (EPC) of a wind park farm in Brazil from the supplier perspective. Based on SD both, the risks of the project as well as the risks of the project stakeholders are considered. Whereby the chapter shares the risk identification as such as well as the process for which a systemic board constellation was applied.


2020 ◽  
Vol 4 (2) ◽  
pp. 379-389
Author(s):  
Alimuddin Alimuddin ◽  
Rulhendri Rulhendri ◽  
Nurul Chayati ◽  
Jafar Sidik

In order to improve educational facilities and infrastructure, Department of Housing and Settlements, Depok City  plans to reconstruction a school building. With the impacts caused by this activity, an environmental impact assessment is needed. The purpose of this study is to obtain the results of an analysis of environmental impact studies and ways of mitigation in minimizing the impacts that occur during pre construction stage, construction stage, and operation stage. The method used is observation, interview and scoping methods to determine the impact and good handling of the environment. The results of this study are obtained an analysis of environmental impacts that occur during the activity and how to minimize the impacts with good handling in order to create an environmental friendly construction.


Sign in / Sign up

Export Citation Format

Share Document