scholarly journals Heat leak of cryogenic pipe for superconducting dc power transmission line (SCDC)

2020 ◽  
Vol 1590 ◽  
pp. 012055
Author(s):  
Sataro Yamaguchi ◽  
Masae Kanda ◽  
Yury Ivanov
2013 ◽  
Vol 457-458 ◽  
pp. 1575-1580 ◽  
Author(s):  
Zhen Liu ◽  
Kuan Jun Zhu ◽  
Jian Cheng Wan ◽  
Jun Zhang ◽  
Jia Jun Si ◽  
...  

At present, large section conductors applied in domestic ±800kV ultra-high DC power transmission line consist of 6×720mm2, 6×900mm2 and 6×1000mm2 conductors. This paper analyzes initial engineering investment and mechanical performance of 6×JL1/G2A-720/50, 6×JL1/G3A-900/40, 6×JL1/G3A-1000/45, 6×JL1/G2A-1250/70 and 6×JL1/G2A-1520/125 conductor plans, carry out economic comparison of the whole life period of these 5 conductor plans, demonstrate economic of 6×JL1/G2A-1250/70, and 6×JL1/G2A-1520/125 conductor plans in ±800kV ultra-high DC power transmission line is more advantageous when annual loss hours is too high, and the 6×JL1/G2A-1250/70 plan can save initial investment of engineering compared to the 6×JL1/G2A-1520/125 plan.


2012 ◽  
Vol 36 ◽  
pp. 1366-1371 ◽  
Author(s):  
Hirofumi Watanabe ◽  
Yury Ivanov ◽  
Jian Sun ◽  
Makoto Hamabe ◽  
Toshio Kawahara ◽  
...  

2018 ◽  
Vol 1054 ◽  
pp. 012076 ◽  
Author(s):  
Hirofumi Watanabe ◽  
Yury V Ivanov ◽  
Noriko Chikumoto ◽  
Satarou Yamaguchi ◽  
Kotaro Ishiyama ◽  
...  

Author(s):  
M. I. Kazakevitch ◽  
Ye. V. Horokhov ◽  
M. S. Khorol'sky ◽  
S. V. Turbin

Sign in / Sign up

Export Citation Format

Share Document