scholarly journals Numerical simulation and operation characteristics analysis of folded line concrete face rockfill dam: case study of Yimeng Pumped storage power station

Author(s):  
Qiang Ren ◽  
Guoying Li ◽  
Kuangmin Wei
2018 ◽  
Vol 2018 ◽  
pp. 1-10 ◽  
Author(s):  
Kongzhong Hu ◽  
Jiankang Chen ◽  
Dong Wang

Due to the demand in flood season for power generation, the first-stage face slab of a high concrete-face rockfill dam often must be constructed ahead of schedule, and advanced water storage is needed for the reservoir. Since the dam-body filling has not yet been completed at this point, the internal stress of the first-stage face slab is more complicated than that of normal construction. Taking Buxi Power Station as an example, the first-stage face slab temporary construction seam showed large areas of shear stress damage during the rise in reservoir water levels during the second segment of the second construction stage. The concrete-face slab showed large-piece brittle bulging, and the steel rebar was exposed and developed contortional deformation. Based on the monitoring data for Buxi Power Station along with the first-stage fracture characteristics of Shuibuya concrete face, this paper applied a numerical analysis to conduct research on the causes of fracture mechanics. The results indicate that the cracks occurred on the face slab during the second segment of second-stage water storage primarily due to the advanced concrete pouring of the first-stage face slab; during the first stage of reservoir water storage, the internal stress of the first-stage face slab was not reduced or eliminated prior to second-stage face slab pouring. Thus, with the rise in the reservoir water level, the shear stress increased continuously, eventually leading to partial large-scale shear stress failure of the first-stage face slab. The research results provide important references for the design and construction of concrete-face rockfill dams.


2011 ◽  
Vol 287-290 ◽  
pp. 3002-3006 ◽  
Author(s):  
Cun Dong Xu ◽  
Yan Wang ◽  
Hui Min Hou ◽  
Hai Cheng Li

Compared with the traditional upstream dam slope construction method, the extrusion side wall technology has many advantages. such as less process steps, little interference, quick construction speed etc ,So it arouse more and more attention in the engineer design and construction fields . The technology of extrusion concrete side wall applied to the construction of concrete face rockfill dam in the Bailian river storage power station, machinery and equipment were used on the cushion material to form a concrete wall extrusion , which avoid the traditional process of Ultra-filled cushion material, rolling slopes, cut slopes and other complicated process, not only ensure the quality, but also improve the stress state of the panel.


2012 ◽  
Vol 238 ◽  
pp. 260-263
Author(s):  
Yu Zhao ◽  
Sheng Zhao Cheng ◽  
Jian Wei Zhang

Concrete face rockfill dam is an important type of dam. Dynamic analysis of the dam under seismic conditions is important for researching the safety degrees of face rockfill dam under unusual conditions. This paper takes practical engineering project, Henan Tianchi pumped storage power station, as an example, makes dynamic calculation under seismic conditions, and analyzes the dynamic response of the face slab. This paper has reference meaning for face rockfill dam's design and construction.


2012 ◽  
Vol 06 (02) ◽  
pp. 1250007 ◽  
Author(s):  
DEGAO ZOU ◽  
YANG ZHOU ◽  
HOE I. LING ◽  
XIANJING KONG ◽  
BIN XU

Zipingpu concrete face rockfill dam (CFRD) is one of the tallest dams that have ever been subjected to strong earthquake shaking and recorded damages. In this paper, finite element method and limit equilibrium method are used to determine the most critical failure surface for Zipingpu CFRD during the 2008 Wenchuan earthquake in China. The dislocation damage of the face-slab joint was then obtained from the sliding block analysis. The major factors affecting dislocation displacement of face-slabs were analyzed. The results showed that the rigid sliding block method is relevant for analyzing the damage of face-slabs of CFRD during earthquake. The peak ground acceleration had a significant influence on the dislocation. As the acceleration of the dam increases with the height while the strength of face-slab joints reduces, the dislocation could easily occur when the upstream slope of the dam started to slide. The water elevation had considerable impact on the dislocation of face-slabs during strong shaking. There might be no dislocation of face-slabs at full reservoir, and the water elevation just above construction joints would induce larger damage.