scholarly journals Planning of Master Production Schedule at PT Semen Padang

Author(s):  
Aulia Ishak ◽  
Ukurta Tarigan ◽  
A Dwinitha
2015 ◽  
Vol 1 (3) ◽  
pp. 390
Author(s):  
Jalal Abdulkareem Sultan ◽  
Omar Ramzi Jasim ◽  
Sarmad Abdulkhaleq Salih

Production Planning or Master Production Schedule (MPS) is a key interface between marketing and manufacturing, since it links customer service directly to efficient use of production resources. Mismanagement of the MPS is considered as one of fundamental problem in operation and it can potentially lead to poor customer satisfaction.  In this paper, an improved Genetic Algorithm (IGA) is used to solving fuzzy multi-objective master production schedule (FMOMPS). The main idea is to integrate GA with local search operator. The FMOMPS was applied in the Cotton and medical gauzes plant in Mosul city. The application involves determine the gross requirements by demand forecasting using artificial neural networks. The IGA proved its efficiency in solving MPS problems compared with the genetic algorithm for fuzzy and non-fuzzy model, as the results clearly showed the ability of IGA to determine intelligently how much, when, and where the additional capacities (overtimes) are required such that the inventory can be reduced without affecting customer service level.


2020 ◽  
Vol 5 (1) ◽  
pp. 1-12
Author(s):  
Rudi Abdika Saputra ◽  
Inna Kholidasari ◽  
Susanti Sundari ◽  
Lestari Setiawati

This study discusses the application of the material requirements planning (MRP) method in the planning of raw materials in a furniture company. The purpose of this research is to know the planning of raw materials for furniture products in UD. AA, determine the most suitable inventory model to be applied to material inventory planning and analyze the role of the MRP system in raw material procurement planning. The forecasting method used is the quantitative method of time series analysis, determining the master production schedule, calculating lot sizing (LFL, EOQ, POQ methods). From determining the Master Production Schedule, it is found that the cabinet production plan for the next three months is 4 units per period or week, and based on the calculation of Material Requirement Planning (MRP) it can be seen what components are needed for the manufacture of cabinets, how many and when each component is required. Therefore it is obtained that the total raw material requirement for wood for the next three months is 11.34 m³.


Sign in / Sign up

Export Citation Format

Share Document