scholarly journals Practical Application of Value Stream Mapping in Process Improvement of Emergency Department Testing Turnaround Time

2012 ◽  
Vol 138 (suppl 2) ◽  
pp. A250-A250
Author(s):  
Caroline Satyadi
2017 ◽  
Vol 2017 ◽  
pp. 1-11 ◽  
Author(s):  
Korakot Yuvamitra ◽  
Jim Lee ◽  
Kanjicai Dong

In today’s competitive market place, manufacturing companies must apply continuous process improvement in order to maintain a returning customer base. One way of achieving constant process improvement is through value stream mapping. Value stream mapping is used to visualize the current processes for easier understanding and problem identification. A well-defined problem statement will ensure a successful outcome of a project improvement process. This research provides a case study performed on a rope manufacturing process. A current state value stream map is created, and the possible improvements are suggested. The implemented results are shown in the form of future state map. The results show that, after waste elimination and structural revision, a manufacturing process becomes more efficient, enabling the customer to receive an order significantly faster.


2021 ◽  
Vol 28 (1) ◽  
Author(s):  
Gino Flávio Vieira ◽  
James Manoel Guimarães Weiss

abstract: This article explores the application of lean thinking concepts in the analysis and obtaining of significant process improvements in building elevators installations. Based on a pilot installation, planned to analyze the installation processes of an elevator manufacturer, the authors compared two similar elevator installations. In one of them, they applied various lean thinking concepts and tools, with particular emphasis on template A3 and value stream mapping (VSM). This pilot installation planning was also developed based on the recommendations for efficient project management, structured by the Project Management Institute (PMI). The application of the template A3 and the value stream mapping to the installation of one of the elevators resulted in increased productivity, reduced installation times, and increased final quality of the product installed.


2005 ◽  
Vol 46 (3) ◽  
pp. 108 ◽  
Author(s):  
R.L. Kaale ◽  
D.D. Vega ◽  
K. Messner ◽  
D.R. Eitel ◽  
D.E. Johnson ◽  
...  

2015 ◽  
Vol 48 (4-5) ◽  
pp. 308-312 ◽  
Author(s):  
Arlene M. Boelstler ◽  
Ralph Rowland ◽  
Jennifer Theoret ◽  
Robert B. Takla ◽  
Susan Szpunar ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document