A New Construction Method of Zero-Correlation Zone Sequences Based on Complete Complementary Codes

Author(s):  
C. HAN ◽  
T. HASHIMOTO ◽  
N. SUEHIRO
2018 ◽  
Vol 39 (3) ◽  
pp. 359-368 ◽  
Author(s):  
Benattou Fassi ◽  
Abdelmalik Taleb-Ahmed

Abstract A new method for constructing optical zero-correlation zone (OZCZ) codes based on the Hadamard matrix and the concatenation operation is proposed. The most important property of the obtained codes is that the periodic correlation function of the proposed codes is zero for the phase shifts within the zero-correlation zone. The structure of the proposed OZCZ code is simple and their construction is more flexible. The proposed code is expected to be useful for reducing co-channel interference in optical code division multiple access system.


2011 ◽  
Vol 368-373 ◽  
pp. 2711-2715 ◽  
Author(s):  
De Yun Ding ◽  
Xiu Ren Yang ◽  
Wei Dong Lu ◽  
Wei Ning Liu ◽  
Mei Yan ◽  
...  

In more and more complicated urban building environment, a new construction method that metro engineering is constructed by large-diameter shield and shallow mining method can be regarded as a great attempt in China. By taking the Gaojiayuan station of Beijing metro line 14 as an engineering background, the main construction steps for the platform of the metro station built by a large-size shield with an outer diameter of 10 m and the Pile-Beam-Arch (PBA) method are introduced. Based on the soil-structure interaction theory, a two-dimensional finite element model is used to simulate the shield tunneling and the platform construction by the PBA method to enlarge the shield tunnel. The ground deformation and structural stress of the platform are predicted. The numerical results can be regarded as a valuable reference for the application of the new construction method in Beijing metro line 14.


Sign in / Sign up

Export Citation Format

Share Document