Optimum maintenance plan of electric power apparatus in consideration of maintenance history by Intelligent Grid Management System (IGMS)

Author(s):  
Kosei Sinoda ◽  
Masahiro Hanai ◽  
Kaio Wakaiki ◽  
Hiroki Kojima ◽  
Naoki Hayakawa ◽  
...  
2012 ◽  
pp. 1083-1088
Author(s):  
O.H. Ando Junior ◽  
M.O. Oliveira ◽  
J.M. Neto ◽  
A.D. Spacek ◽  
R.C.B. Leborgne ◽  
...  

IEEE Access ◽  
2021 ◽  
Vol 9 ◽  
pp. 48713-48731
Author(s):  
William Felipe Ceccon ◽  
Roberto Z. Freire ◽  
Anderson Luis Szejka ◽  
Osiris Canciglieri Junior

Author(s):  
Di Liu ◽  
ChunYang Li ◽  
Zhihang Jiang ◽  
Rui Kong ◽  
Lei Wu ◽  
...  

Author(s):  
Abdul Rahman ◽  
Nadeem Javaid ◽  
Muhammad Asad Zaheer ◽  
Maryam Bibi ◽  
Zoha Fatima ◽  
...  

Author(s):  
H.V.V. Priyadarshana ◽  
K.T.M. U Hemapala ◽  
W.D.A. S Wijayapala ◽  
V. Saravanan ◽  
M.A. Kalhan S. Boralessa

Author(s):  
J. Oyarzabal ◽  
J. Jimeno ◽  
J. Ruela ◽  
A. Engler ◽  
C. Hardt

2015 ◽  
Vol 733 ◽  
pp. 951-954
Author(s):  
Li Li Yuan ◽  
Lin Liu ◽  
Bai Li Yuan ◽  
Bin Li

This paper discusses the necessity of the management for power enterprise trainer. It proposed the use of intelligent computer technology to build electric power enterprise trainer management system according to the current status of the work of power. This paper analysis the current needs of the power of corporate trainer and proposed the overall architecture of power enterprise trainer management system, and design the function of each subsystem.


2013 ◽  
Vol 448-453 ◽  
pp. 4369-4375
Author(s):  
Hui Zhang ◽  
Yi Hu Zhang

The application of lean construction theory in building green substation was discussed. The study on integration of design-build indicated that the electric power design institute as the general contractor should change the mode of only setting up one secondary organization to manage the engineering, and should improve the management system and change the producing idea. The study on the combination of the last planner system and building the substation indicated that the measures of arranging the work and setting the workload reasonably and enhancing the supply of important resources etc. could increase the Percent Plan Complete of building the substation. At last, the 4-saving and 1-environmental protection measures of green construction of substation were brought out.


Sign in / Sign up

Export Citation Format

Share Document