Large scale project organization networks and operational mechanism

Author(s):  
Jing Yang ◽  
Sen Chen ◽  
Yingwu Chen
2022 ◽  
pp. 388-398
Author(s):  
Ayesha Khalid ◽  
Shariq Aziz Butt ◽  
Tauseef Jamal ◽  
Saikat Gochhait

The agile model is a very vast and popular model in use in the software industry currently. It changes the way software is developed. It was introduced in 2001 to overcome deficiencies of software development in a workshop arranged by researchers and practitioners who were involved with the agile concept. They introduced the complete agile manifesto. The agile model has main components that make it more viable for use in well-organized software development. One of these is scrum methodology. The reason for the agile-scrum popularity is its use for small-scale projects, making small teams and allows change requests at any stage of a project from the client. It works for client satisfaction. Instead of so much popularity and distinctive features, agile-scrum also has some limitations when used for large scale projects development that makes it less efficient for development. This article discusses the agile-scrum methodology and its limitations when using for large-scale project organization.


2020 ◽  
Vol 8 (2) ◽  
pp. 85-94
Author(s):  
Ayesha Khalid ◽  
Shariq Aziz Butt ◽  
Tauseef Jamal ◽  
Saikat Gochhait

The agile model is a very vast and popular model in use in the software industry currently. It changes the way software is developed. It was introduced in 2001 to overcome deficiencies of software development in a workshop arranged by researchers and practitioners who were involved with the agile concept. They introduced the complete agile manifesto. The agile model has main components that make it more viable for use in well-organized software development. One of these is scrum methodology. The reason for the agile-scrum popularity is its use for small-scale projects, making small teams and allows change requests at any stage of a project from the client. It works for client satisfaction. Instead of so much popularity and distinctive features, agile-scrum also has some limitations when used for large scale projects development that makes it less efficient for development. This article discusses the agile-scrum methodology and its limitations when using for large-scale project organization.


2014 ◽  
Vol 12 ◽  
pp. 3-11
Author(s):  
Zuzana Pešková

In 2006, the town council of Slany decided to respond to the new trend of regional policy in the Central Bohemia region and focused on the revitalization of the historic core of the town. The large-scale project was assigned to a team of professionals (teachers and graduates of the Faculty of Civil Engineering of the Czech Technical University in Prague), led by Professor Sykora. Team members are to deal with issues of historical centre. The project presented a challenge to test theory, principles and procedures in practical design. The projected area featured Masaryk Square and 22 adjacent streets defined by the existing town walls. The reconstruction project of Vinarickeho Street was the first part of the overall project of revitalization of the historic core of the town chosen to implement. This reconstruction was one of the most technically, organizationally and financially complex works that have been undertaken in Slany recently. Construction started in November 2010 and lasted one year. Although this is a project of smaller scope, thanks to its complexity, sensitive approach and craftsmanship it brought the creators the price Construction of the Year 2012 in the Central Bohemia region and advanced to the second round in the competition Construction of the Year 2012 in Czech Republic.


2014 ◽  
Vol 978 ◽  
pp. 27-30
Author(s):  
Si Ru Qian

After the WenChuan earthquake in may 12,2008,Many province government built the temporary houses for earthquake disaster area.For the first time, they initiate such large scale project, there are many problems emerged during the process of construction such problem like economy ,environment, engineering materials and technology. In this article, we collect problems and analysis them ,seek for the possible measures of construct the temporary house and the effective way to rebuilt the disaster area.


2018 ◽  
Author(s):  
Janosch Dlouhy ◽  
Miguel Ricalde ◽  
Bernardo Cossio ◽  
Carlos Januncio

Sign in / Sign up

Export Citation Format

Share Document