scholarly journals The Revitalization of the Historic Centre of the Town Slany

2014 ◽  
Vol 12 ◽  
pp. 3-11
Author(s):  
Zuzana Pešková

In 2006, the town council of Slany decided to respond to the new trend of regional policy in the Central Bohemia region and focused on the revitalization of the historic core of the town. The large-scale project was assigned to a team of professionals (teachers and graduates of the Faculty of Civil Engineering of the Czech Technical University in Prague), led by Professor Sykora. Team members are to deal with issues of historical centre. The project presented a challenge to test theory, principles and procedures in practical design. The projected area featured Masaryk Square and 22 adjacent streets defined by the existing town walls. The reconstruction project of Vinarickeho Street was the first part of the overall project of revitalization of the historic core of the town chosen to implement. This reconstruction was one of the most technically, organizationally and financially complex works that have been undertaken in Slany recently. Construction started in November 2010 and lasted one year. Although this is a project of smaller scope, thanks to its complexity, sensitive approach and craftsmanship it brought the creators the price Construction of the Year 2012 in the Central Bohemia region and advanced to the second round in the competition Construction of the Year 2012 in Czech Republic.

2019 ◽  
Vol 65 (4) ◽  
pp. 848-868
Author(s):  
Aseem Mishra

Large chunks of land have been acquired in different parts of India for large-scale infrastructure projects, such as dams, power stations, etc., in the past. The Bhakra Dam project, being one such large-scale project executed immediately after the Independence, displaced thousands of families without having any proper rehabilitation mechanism in place. The old Bilaspur town (OBT) was part of land acquired for construction of the reservoir for Bhakra Dam, known as Gobind Sagar Lake. The new Bilaspur township was established to rehabilitate families originally living in the OBT. Presently, second or third generation of these families are living on these allotted plots in the new town. This article is an attempt to unfold the flaws in the undertaken rehabilitation policy which has led to unplanned and haphazard development in the town as well as created problems for both oustees and public authorities. These problems continue to persist in present times also, thereby limiting the citizens to avail benefits of the recent policy for regularisation of encroachments and the newly launched housing programme—Pradhan Mantri Awas Yojana.


Author(s):  
Lynne Siemens

Use of project teams is increasing, however little is known about collaboration as it actually occurs over the life of projects. This paper explores the nature of collaboration within Implementing New Knowledge Environments (INKE) after three years of funded research. The third year is characterized by change and transition with new team members, partners, and sub-research areas. INKE continues to draw upon structures and processes, including team building activities, in-person meetings, multiple communication channels, evolving governance documents to support the collaboration, and incorporating collaboration-ready individuals.  The paper concludes with recommendations for similar long term, large-scale project teams.


2021 ◽  
Author(s):  
Marion Germain ◽  
Daniel Kneeshaw ◽  
Louis De Grandpré ◽  
Mélanie Desrochers ◽  
Patrick M. A. James ◽  
...  

Abstract Context Although the spatiotemporal dynamics of spruce budworm outbreaks have been intensively studied, forecasting outbreaks remains challenging. During outbreaks, budworm-linked warblers (Tennessee, Cape May, and bay-breasted warbler) show a strong positive response to increases in spruce budworm, but little is known about the relative timing of these responses. Objectives We hypothesized that these warblers could be used as sentinels of future defoliation of budworm host trees. We examined the timing and magnitude of the relationships between defoliation by spruce budworm and changes in the probability of presence of warblers to determine whether they responded to budworm infestation before local defoliation being observed by standard detection methods. Methods We modelled this relationship using large-scale point count surveys of songbirds and maps of cumulative time-lagged defoliation over multiple spatial scales (2–30 km radius around sampling points) in Quebec, Canada. Results All three warbler species responded positively to defoliation at each spatial scale considered, but the timing of their response differed. Maximum probability of presence of Tennessee and Cape May warbler coincided with observations of local defoliation, or provided a one year warning, making them of little use to guide early interventions. In contrast, the probability of presence of bay-breasted warbler consistently increased 3–4 years before defoliation was detectable. Conclusions Early detection is a critical step in the management of spruce budworm outbreaks and rapid increases in the probability of presence of bay-breasted warbler could be used to identify future epicenters and target ground-based local sampling of spruce budworm.


Author(s):  
T. M. O. Franzen ◽  
N. Hurley-Walker ◽  
S. V. White ◽  
P. J. Hancock ◽  
N. Seymour ◽  
...  

Abstract We present the South Galactic Pole (SGP) data release from the GaLactic and Extragalactic All-sky Murchison Widefield Array (GLEAM) survey. These data combine both years of GLEAM observations at 72–231 MHz conducted with the Murchison Widefield Array (MWA) and cover an area of 5 113 $\mathrm{deg}^{2}$ centred on the SGP at $20^{\mathrm{h}} 40^{\mathrm{m}} < \mathrm{RA} < 05^{\mathrm{h}} 04^{\mathrm{m}}$ and $-48^{\circ} < \mathrm{Dec} < -2^{\circ} $ . At 216 MHz, the typical rms noise is ${\approx}5$ mJy beam–1 and the angular resolution ${\approx}2$ arcmin. The source catalogue contains a total of 108 851 components above $5\sigma$ , of which 77% have measured spectral indices between 72 and 231 MHz. Improvements to the data reduction in this release include the use of the GLEAM Extragalactic catalogue as a sky model to calibrate the data, a more efficient and automated algorithm to deconvolve the snapshot images, and a more accurate primary beam model to correct the flux scale. This data release enables more sensitive large-scale studies of extragalactic source populations as well as spectral variability studies on a one-year timescale.


2021 ◽  
Author(s):  
Xingfu Zhang ◽  
Qiujie Chen ◽  
Yunzhong Shen

&lt;p&gt;&amp;#160; &amp;#160; &amp;#160; Although the Gravity Recovery and Climate Experiment (GRACE) and GRACE Follow-On (GRACE FO) satellite missions play an important role in monitoring global mass changes within the Earth system, there is a data gap of about one year spanning July 2017 to May 2018, which leads to discontinuous gravity observations for monitoring global mass changes. As an alternative mission, the SWARM satellites can provide gravity observations to close this data gap. In this paper, we are dedicated to developing alternative monthly time-variable gravity field solutions from SWARM data. Using kinematic orbits of SWARM from ITSG for the period January 2015 to September 2020, we have generated a preliminary time series of monthly gravity field models named Tongji-Swarm2019 up to degree and order 60. The comparisons between Tongji-Swarm2019 and GRACE/GRACE-FO monthly solutions show that Tongji-Swarm2019 solutions agree with GRACE/GRACE-FO models in terms of large-scale mass change signals over amazon, Greenland and other regions. We can conclude that Tongji-Swarm2019 monthly gravity field models are able to close the gap between GRACE and GRACE FO.&lt;/p&gt;


2011 ◽  
Vol 59 (spe1) ◽  
pp. 43-53 ◽  
Author(s):  
Frederico Brandini ◽  
Ariel Scheffer da Silva

Concrete modules were deployed on the bottom of the 11, 18 and 30 meters isobaths along a cross-shelf hydrographic gradient off Paraná State, Southern Brazil, with the purpose of studying the colonization of sessile epilithic macroinvertebrates on artificial surfaces. After one year of submersion a total of 63 species of epilithic organisms were identified, dominated by Ostrea puelchana, Chthamalus bisinuatus, Balanus cf spongicola, Astrangia cf rathbuni, Didemnum spp, poryphers and bryozoans. Diversity index and percent cover at reef stations placed at 11, 18 and 30 meters isobaths were respectively 2.28 and 66.7%, 2.79 and 96.6% and 1.66 and 77.4%. Differences of general community structure among the three assemblages were not clearly related to the general environmental conditions at the bottom layers near the reef stations. Turbidity and larval abundance are discussed as important factors affecting colonization processes. Results indicate that depths between 15-20 meters are more suitable for the implementation of large scale artificial reef systems in the inner shelf off Paraná and, possibly, throughout the inner shelves off southern Brazil with similar hydrographic conditions.


Author(s):  
Meisha Rosenberg ◽  
Judy M. Vance

Successful collaborative design requires in-depth communication between experts from different disciplines. Many design decisions are made based on a shared mental model and understanding of key features and functions before the first prototype is built. Large-Scale Immersive Computing Environments (LSICEs) provide the opportunity for teams of experts to view and interact with 3D CAD models using natural human motions to explore potential design configurations. This paper presents the results of a class exercise where student design teams used an LSICE to examine their design ideas and make decisions during the design process. The goal of this research is to gain an understanding of (1) whether the decisions made by the students are improved by full-scale visualizations of their designs in LSICEs, (2) how the use of LSICEs affect the communication of students with collaborators and clients, and (3) how the interaction methods provided in LSICEs affect the design process. The results of this research indicate that the use of LSICEs improves communication among design team members.


2014 ◽  
Vol 978 ◽  
pp. 27-30
Author(s):  
Si Ru Qian

After the WenChuan earthquake in may 12,2008,Many province government built the temporary houses for earthquake disaster area.For the first time, they initiate such large scale project, there are many problems emerged during the process of construction such problem like economy ,environment, engineering materials and technology. In this article, we collect problems and analysis them ,seek for the possible measures of construct the temporary house and the effective way to rebuilt the disaster area.


Sign in / Sign up

Export Citation Format

Share Document