A Preventive Maintenance Planning Approach for Wind Converters

Author(s):  
Amirali Davoodi ◽  
Saeed Peyghami ◽  
Yongheng Yang ◽  
Tomislav Dragicevic ◽  
Frede Blaabjerg
2015 ◽  
Vol 2015 ◽  
pp. 1-9 ◽  
Author(s):  
Jianfei Ye ◽  
Huimin Ma

In order to solve the joint optimization of production scheduling and maintenance planning problem in the flexible job-shop, a multiobjective joint optimization model considering the maximum completion time and maintenance costs per unit time is established based on the concept of flexible job-shop and preventive maintenance. A weighted sum method is adopted to eliminate the index dimension. In addition, a double-coded genetic algorithm is designed according to the problem characteristics. The best result under the circumstances of joint decision-making is obtained through multiple simulation experiments, which proves the validity of the algorithm. We can prove the superiority of joint optimization model by comparing the result of joint decision-making project with the result of independent decision-making project under fixed preventive maintenance period. This study will enrich and expand the theoretical framework and analytical methods of this problem; it provides a scientific decision analysis method for enterprise to make production plan and maintenance plan.


2010 ◽  
Vol 59 (3) ◽  
pp. 496-506 ◽  
Author(s):  
Mustapha Nourelfath ◽  
Mohamed-Chahir Fitouhi ◽  
Mahdi Machani

Author(s):  
Hamed Pouryousef ◽  
Paulo Teixeira ◽  
Joseph Sussman

HSRs are a complex system not only in terms of technical specifications, but also with respect to operations and maintenance over the track structure. Also, track structure is basically considered as the most important and costly railway asset. Its maintenance is vital to assure safety and operating practices are also of great importance to assure that a good level of service is provided. Considering track maintenance considerations over a new HSR line, one important and critical feature is the operational regime and the question of whether the line will be operated as mixed (passenger and freight) or dedicated only to passenger traffic. This can influence the maintenance patterns: preventive maintenance planning, maintenances scheduling and assignment issues. This will be different for the dedicated and mixed HSR traffic scenarios. In this research, the main approach is focused on the interactions between track maintenance planning and operational concerns and influences in these two scenarios. With this aim and within the current paper, a model of the preventive maintenance scheduling problem (PMSP) has been selected initially from Budai (2006) and then an upgraded revision of this model (Multi-segment assignment and scheduling of preventive maintenance problem) is introduced. Furthermore, the upgraded model of PMSP has been run over a given HSR line (Tehran-Qom HSR corridor in Iran) based on the comparison between the two scenarios of dedicated HSR and upgraded mixed HSR patterns. The main requirements, similarities and differences between these two scenarios are analyzed based on preventive maintenance scheduling and assignment requisites and interactions over the operating restrictions and considerations such as track possession patterns for maintenance activities. We conclude that decision making between these two scenarios through PMSP modeling are quite complicated and depends on the technical and operational specifications of the given HSR corridor, although some general comments on tradeoffs are possible.


Sign in / Sign up

Export Citation Format

Share Document