Strategic Research on the Value Remodeling of Power Grid Over-Aged Assets-Takes the Overhead Power Transmission Line Transformation of H Power Supply Company as an Example

Author(s):  
Xuefei Zhang ◽  
Zhiwei Li ◽  
Xiaohong Liao ◽  
Fangchao Ke ◽  
Chengzhi Wang
2017 ◽  
Vol 66 (3) ◽  
pp. 595-605 ◽  
Author(s):  
Ramūnas Deltuva ◽  
Robertas Lukočius

AbstractIn Lithuanian and Polish electric power supply systems, the power transmission lines of 400 kV voltage represent one of the most potential sources of electric and magnetic fields generation. The 400 kV double-circuit overhead power transmission line and its surrounding environment were herby described and simulated through Finite Element Method usingCOMSOL Multiphysicsoftware package. This study includes magnetic and electric field calculations. The study shows that the values of magnetic field strength and electric field strength present in the vicinity of a 400 kV overhead power transmission line tend to exceed limit values established in the Normative. Measurements are suggested to be taken for the purpose of finding maximum values of magnetic and electric field strength. To reduce these values, it is recommended to increase the height of supports, and restrict human personal and economic activities.


2021 ◽  
pp. 1-1
Author(s):  
Zhewen Ding ◽  
Xuping Zhang ◽  
Ningmu Zou ◽  
Fei Xiong ◽  
Jinyu Song ◽  
...  

Author(s):  
Nikolai Grigoriev ◽  
◽  
Ivan Ignatenko ◽  
Vladimir Kovalev ◽  
Polina Trofimovich ◽  
...  

The article deals with improvement off the efficiency of external and traction power supply systems using for example indicators of traction substations for a real electric transmission line segment of a traction network of 25 kV. The analysis of the functioning of a real section of electrified railways with traction substations, two of which are connected according to the "feeding" scheme is providing in the article. The currents in the wind-ings of traction transformers are calculate for these substations. The proportion of the currents values of the most loaded winding to the two less loaded is 2: 1. The coefficient asymmetry of currents of transformer wind-ings operating on existing traction substations is equal to 1. The results prove a significant currents asymmetry of transformers windings and phases of electric transmission lines which leads to an increasing voltage unbal-ance. New schemes for connecting traction substations for the considered section of electrified railways have been developed in order to improve the quality indicators of electrical energy. New connection schemes for three traction substations, determined according to the requirements for connecting to the external and trac-tion power supply system are presents in the article. The calculation for new schemes of connecting traction substations, similar to the previously considered option, has been performed. The values of winding currents, power transmission line phases and coefficient asymmetry were obtained for new substation connection schemes. The proposed schemes for connecting traction substations provide a decrease in the coefficient asym-metry of the winding currents from 1 to 0.5 and a decrease in the current modulus in the most loaded windings by 1.5 times. New schemes for connecting traction substations reduce the currents of the most loaded windings and phases of the power transmission line, as well as the asymmetry of currents, which ensures an improvement in the efficiency of the external and traction power supply systems of the real traction network.