Calculation method of an unwinding machine electric drive's breaking torque alteration on a rebar production line

Author(s):  
I. R. Safin ◽  
S. I. Lukyanov ◽  
E. E. Bodrov
2013 ◽  
Vol 328 ◽  
pp. 28-33
Author(s):  
Qiong He ◽  
Yu Liu ◽  
Hong Ye Ma

5S concept has a great effect on site-improvements, and it has been used to promote productivity, improve the environment of production process, and upgrade the working ability of workers etc. In this paper, 5S concept has been used to balance the production line, and S production line has been shown as an example. In addition, line balance chart and production line utilization rate calculation method have been used to exhibit the effect of 5S site-improvements on production line balance and increasing productivity.


CICTP 2020 ◽  
2020 ◽  
Author(s):  
Guoshuai Zang ◽  
Haizhu Lu ◽  
Guanglai Jin ◽  
Zhixiang Zhang

2013 ◽  
Vol 133 (4) ◽  
pp. 343-349
Author(s):  
Shunsuke Kawano ◽  
Yasuhiro Hayashi ◽  
Nobuhiko Itaya ◽  
Tomihiro Takano ◽  
Tetsufumi Ono

1993 ◽  
Vol 113 (3) ◽  
pp. 252-258
Author(s):  
Kiyoto Nishijima ◽  
Itaru Tsuneyasu ◽  
Hiraku Nakahodo ◽  
Masaharu Minakami

Sign in / Sign up

Export Citation Format

Share Document