Risk Assessment for Transmission Network Planning Scheme based on Conditional Value-at-Risk

Author(s):  
ZOU Qi ◽  
QIAN Junjie ◽  
YOU Dahai ◽  
XU Heng ◽  
LIU Hengwei ◽  
...  
2013 ◽  
Vol 732-733 ◽  
pp. 1292-1296
Author(s):  
Lian Guang Liu ◽  
Wan Li Zhao ◽  
Yan Wei Chen

The comprehensive fuzzy evaluation method for transmission network planning scheme has the drawback that relying more on the subjectivity. To solve this problem, gray theory is introduced into comprehensive fuzzy evaluation method. Gray correlation analysis method is used to calculate gray correlation coefficient as the membership of evaluation index to get fuzzy evaluation matrix. Then, the fuzzy weight vector is determined by the subjective and objective empowerment by integrating AHP and entropy method. Comprehensive fuzzy evaluation vector is obtained by using composite operator to synthesis evaluation matrix and fuzzy weight vector. The obtained result is used to evaluate transmission network planning scheme. Therefore, the problem that judger definate membership function based on subjective view is solved by combining the two methods. Calculation results show that the proposed method has a certain practical value.


2014 ◽  
Vol 986-987 ◽  
pp. 639-642
Author(s):  
Shen Quan Yang ◽  
Xing Wang Hu ◽  
Zhi Jie Zheng ◽  
Kui Hua Wu ◽  
Yi Qun Wang

Traditional Transmission Network Planning scheme only considers N and N-1 security , with little regard for safety of N-2 system. This paper introduces the relaxation factor establishing Transmission Network Planning model, and further considers the N-2 secure of double-circuit transmission line on the basis of relaxation on the N-1 constraints. A hierarchical genetic algorithm (HGA) Model is proposed to solve the model.The final Transmission Network Planning scheme meets the reliability requirements under uncertain environment and has the minimum overall cost.A simulation model to simulate the impact of construction of the same tower line on the investment and security of transmission network planning is builded.


2013 ◽  
Vol 13 (7) ◽  
pp. 974-983 ◽  
Author(s):  
M.N. Dargiri ◽  
H.A. Shamsabadi ◽  
C.K. Thim ◽  
D. Rasiah ◽  
B. Sayedy

Sign in / Sign up

Export Citation Format

Share Document