Based on extensive research, introduced the peak load regulation characteristics and capacity of different nuclear power plant (NPP) in this paper. The running mode of NPP participating in peak load regulation of power system, combined operation tactics of NPP with other peaking power source and synergistic scheduling of an integrated power generation system with wind, photovoltaic, energy storage unit and NPP were summarized, technology development trend of NPP participating in peak load regulation of power system was analyzed and forecasted.


2020 ◽  
Vol 143 ◽  
pp. 02047
Author(s):  
Shufang Tang ◽  
Guoan Tang ◽  
Xiaohong He ◽  
Lijun Zheng ◽  
Cong Yu ◽  
...  

This paper introduces the retrofit scheme of the New Condensing Extraction Backpressure heating technology, and the technology is recommend for use by comparing and analysing the combined heat and power system based on a 330MW unit retrofit. After improvement, the heating capacity has been Obvious improved, the generation power has been greatly reduced and the capacity of peak load regulation has been significantly improved, which can not only realize the thermoelectric decoupling, but also obtain the remarkable economic benefit.


2018 ◽  
Vol 152 ◽  
pp. 227-232 ◽  
Author(s):  
Feixiang Peng ◽  
Wei Zhou ◽  
Xin Sui ◽  
Shubo Hu ◽  
Hui Sun ◽  
...  

2014 ◽  
Vol 986-987 ◽  
pp. 465-469 ◽  
Author(s):  
Gang Wang ◽  
Xiao Dong Ma ◽  
Chao Wang ◽  
Peng Ye

Base on Nuclear Power Plant (NPP) participating in peak load regulation of power grid, this paper studies the operation mode of hydropower, thermal power and NPP in Combined Peak Load Regulation. The optimization model for Peaking depth of NPP was set up. The case based on actual power grid were calculated and analyzed, results of the research show that in combined peak load regulation of hydropower, thermal power and NPP, a reasonable peaking depth of NPP will effectively alleviate the peaking pressure of power grid, avoid start-stop of thermal power and abandoned water of hydropower, while ensuring the hydroelectric generating capacity in the low load periods, and ensure thermal power output smooth, it further reduce the operating costs, verify the effectiveness of the model.


2014 ◽  
Vol 672-674 ◽  
pp. 246-250 ◽  
Author(s):  
Kui Luo ◽  
Wen Hui Shi ◽  
Hao Zha

Wind power planning towards large-scale accommodation of wind power while satisfying technical and economical constraints, it should consider power system adaptability and economy when giving full play to the wind benefits. This paper considers the relationship among wind power accommodation, construction of transmission lines and conventional unit operation costs and proposes an economic and reasonable wind power planning approach aiming at accommodating wind power efficiently and effectively. Combined the constrains of peak load regulation and network construction together, optimal wind power planning model is established, and based on the system operation simulation, a series of wind power planning evaluation index are obtained, which can estimate the wind power planning scheme from multiple angles. Finally, the feasibility and reasonability of the proposed planning approach has been verified by a numerical test system.


Sign in / Sign up

Export Citation Format

Share Document