Role of STATCOM in improving the power quality issues in hybrid power plant connected to a power grid

Author(s):  
Ishtiyaq Shafi Rafiqi ◽  
Abdul Hamid Bhat
2018 ◽  
Vol 31 ◽  
pp. 02001
Author(s):  
Rina Irawati

Diesel Generator with Photovoltaic Hybrid Power Plant is one of the solutions for supply electric demand to isolated area. The energy sources that can be used for hybrid system are such as photovoltaic, wind turbine, and biomass or biogas, because these sources are almost available in every isolated area. This research used a model of hybrid system from diesel generator and 1.28 kWp photovoltaic power plant. The reliability and some of power quality of this system tested by 1300VA house hold daily load characteristic effectively 24 hour. Power quality and some electricity parameters during transition mode for each resource will be analyzed. Furthermore the power quality analyze will be conducted and evaluated base on Electrical Engineers’ Association (EEA).


2020 ◽  
Author(s):  
Langlang Gumilar ◽  
Denis Eka Cahyani ◽  
Arif Nur Afandi ◽  
Dezetty Monika ◽  
Stieven Netanel Rumokoy

2018 ◽  
Vol 13 (2) ◽  
pp. 107
Author(s):  
Flur Ismagilov ◽  
Vajcheslav Vavilov ◽  
Oksana Yushkova ◽  
Vladimir Bekuzin ◽  
Alexey Veselov

2019 ◽  
Vol 8 (4) ◽  
pp. 9449-9456

This paper proposes the reliability index of wind-solar hybrid power plants using the expected energy not supplied method. The location of this research is wind-solar hybrid power plants Pantai Baru, Bantul, Special Region of Yogyakarta, Indonesia. The method to determine the reliability of the power plant is the expected energy not supplied (EENS) method. This analysis used hybrid plant operational data in 2018. The results of the analysis have been done on the Pantai Baru hybrid power plant about reliability for electric power systems with EENS. The results of this study can be concluded that based on the load duration curve, loads have a load more than the operating kW of the system that is 99 kW. In contrast, the total power contained in the Pantai Baru hybrid power plant is 90 kW. This fact makes the system forced to release the load. The reliability index of the power system in the initial conditions, it produces an EENS value in 2018, resulting in a total value of 2,512% or 449 kW. The EENS value still does not meet the standards set by the National Electricity Market (NEM), which is <0.002% per year. Based on this data, it can be said that the reliability of the New Coast hybrid power generation system in 2018 is in the unreliable category.


IEEE Access ◽  
2016 ◽  
Vol 4 ◽  
pp. 8793-8804 ◽  
Author(s):  
Michel R. Miyazaki ◽  
Asgeir J. Sorensen ◽  
Nicolas Lefebvre ◽  
Kevin K. Yum ◽  
Eilif Pedersen

Sign in / Sign up

Export Citation Format

Share Document