scholarly journals Internet of Things for Survey of Renewable Energy Potential (SREP) as the Basis for Hybrid Power Plant Development

2016 ◽  
Vol 54 ◽  
pp. 06003 ◽  
Author(s):  
Muslikhin ◽  
Eko Marpanaji ◽  
Muh. IzzuddinMahali
Author(s):  
Anggara Trisna Nugraha ◽  
Dadang Priyambodo

The need for electrical energy in Indonesia continues to increase every year. In line with the increase in the electrification ratio to 100% in 2050, the demand for electrical energy is projected to reach 7 times, namely 1,611 TWh. To meet electricity needs, the government has created a 35 GW program, but one of the largest contributors to power generation fuel is coal with a share of 58% or around 50 GW which is estimated to be exhausted within the next 68 years. For this reason, innovations are needed in terms of fulfilling electrical energy by utilizing renewable energy potential, one of which is hydro energy, which is 45,379 MW from a total resource of 75,091 MW. Therefore, from this potential, innovations related to renewable energy have been created, namely the Hybrid Portable Underwater Turbine Hydro and Solar Energy hybrid power plant. This power plant uses an undersea current as a propulsion which is hybridized with solar power to increase the production of electrical energy. This power plant has the advantage that there is an Underwater turbine design that is resistant to underwater flow and a water flow direction to increase the work efficiency of the underwater turbine. From the test results, the portable Underwater turbine hydro produces 950 W in a day. Solar panels produce 65.6 Watts a day. The total hybrid that can be produced is 1.02 kW a day. In its implementation it can supply loads of up to 900 (VA) such as lamps, fans, TV, etc. This hybrid power plant can be a solution to help meet electricity needs in the area around Dusun Dongol, Sidoarjo through alternative electrical energy innovations.


An increase in the share of renewable energy sources characterized by intermittent generation leads to a decrease in the quality of electricity and the need to balance the load on the network. The methods used today for balancing the load on the generation side, as well as the use of energy storage technology, do not always provide an effective solution to the balancing problem. This is especially evident when traditional generators are transferred from the base load electricity sources to the reserve ones. The main issue is the increased electric energy losses due to the low efficiency of the power storage technology. Using the most advanced hybrid power plant Gorona del Viento (El Hierro island, Canary archipelago, Spain), which includes traditional and renewable energy sources, as reference, we are describing the methods of balancing the load on the network, which includes balancing, both the electricity generation and consumption. Using the calculation models of the hybrid power plant operating modes, the possibility of implementing various load balancing strategies on the consumption side has been demonstrated, their features have been analyzed, their effectiveness in reducing energy losses has been demonstrated.


Author(s):  
Hocine Guentri ◽  
Mokhtar Benasla ◽  
Kabira Ezaeri

To achieve its renewable energy targets, Algeria has launched several projects, such as the Hassi Rmel solar thermal-gas hybrid power plant, the Taberkine wind farm in Adrar, and several small photovoltaic power plants. Besides, others planned including, the Naama PV plant. In this study, the impact of the expected photovoltaic power plant at the province of Naama on the southwestern network of Algeria. The obtained results indicate that the installation of this plant would have a positive impact on the system by reducing the losses active and improving the voltage profile.


Electronics ◽  
2021 ◽  
Vol 10 (7) ◽  
pp. 796
Author(s):  
Susana Martín-Arroyo ◽  
José Antonio Cebollero ◽  
Miguel García-Gracia ◽  
Álvaro Llamazares

Stand-alone hybrid power plants based on renewable energy sources are becoming a more and more interesting alternative. However, their management is a complex task because there are many variables, requirements and restrictions as well as a wide variety of possible scenarios. Though a proper sizing of the power plant is necessary to obtain a competitive cost of the energy, smart management is key to guarantee the power supply at a minimum cost. In this work, a novel hybrid power plant control strategy is designed, implemented and simulated under a wide variety of scenarios. Thereby, the proposed control algorithm aims to achieve maximum integration of renewable energy, reducing the usage of non-renewable generators as much as possible and guaranteeing the stability of the microgrid. Different scenarios and case studies have been analyzed by dynamic simulation to verify the proper operation of the power plant controller. The main novelties of this work are: (i) the stand-alone hybrid power plant management regarding a battery energy storage system as a part of the spinning reserve, (ii) the characterization of the largest loads as non-priority loads, (iii) the minimization of the needed spinning reserve and fuel consumption from diesel generators.


2018 ◽  
Vol 13 (2) ◽  
pp. 107
Author(s):  
Flur Ismagilov ◽  
Vajcheslav Vavilov ◽  
Oksana Yushkova ◽  
Vladimir Bekuzin ◽  
Alexey Veselov

2019 ◽  
Vol 8 (4) ◽  
pp. 9449-9456

This paper proposes the reliability index of wind-solar hybrid power plants using the expected energy not supplied method. The location of this research is wind-solar hybrid power plants Pantai Baru, Bantul, Special Region of Yogyakarta, Indonesia. The method to determine the reliability of the power plant is the expected energy not supplied (EENS) method. This analysis used hybrid plant operational data in 2018. The results of the analysis have been done on the Pantai Baru hybrid power plant about reliability for electric power systems with EENS. The results of this study can be concluded that based on the load duration curve, loads have a load more than the operating kW of the system that is 99 kW. In contrast, the total power contained in the Pantai Baru hybrid power plant is 90 kW. This fact makes the system forced to release the load. The reliability index of the power system in the initial conditions, it produces an EENS value in 2018, resulting in a total value of 2,512% or 449 kW. The EENS value still does not meet the standards set by the National Electricity Market (NEM), which is <0.002% per year. Based on this data, it can be said that the reliability of the New Coast hybrid power generation system in 2018 is in the unreliable category.