Experience in Belgium With Aircraft Jet Engine Peaking Units
Keyword(s):
The paper describes briefly the five 20-MW and the 40-MW turbojet electric power plants. The methods of operation and the difficulties during commissioning and operation are dealt with and some statistics are given. Finally, the maintenance routine and manpower requirements are described.
Keyword(s):
Keyword(s):