Repairing a high-pressure cylinder at the manufacturer’s (Taking the T-110/120-130-5 turbine at the Sakmar cogeneration station as an example)
Keyword(s):
2013 ◽
Vol 457-458
◽
pp. 518-521
Keyword(s):
Keyword(s):
Keyword(s):
2020 ◽
Vol 0
(4(6))
◽
pp. 46-53
Keyword(s):