RESEARCH ON COST CONTROL OF CONSTRUCTION PROJECT IN CHINA BASED ON SYSTEM DYNAMICS

Author(s):  
GAO XU KUO ◽  
XU YAO
2014 ◽  
Vol 501-504 ◽  
pp. 2691-2694
Author(s):  
Wen Zhou Yan ◽  
Peng Chen

The traditional method of project cost control management by objectives based, is a passive expost control, and system dynamics model through the establishment of a strategiclevel description of the project, emphasizing the active control of project costs, focused on the complexity of factors that are difficult to accurately quantify analysis is an important complement to traditional methods. Construction phase of the project cost control of construction project management is one of the main construction phase of the construction project in accordance with established cost control feedback effect diagram, analyze the main factors affecting cost control, qualitative analysis of the impact of the construction phase of the project cost control various factors and cost control effect brought. Proven system dynamics approach applied in the construction phase of the project feasibility.


2014 ◽  
Vol 1079-1080 ◽  
pp. 1115-1118
Author(s):  
Lu Liu

Themain content of the construction project cost management including costforecast, cost plan, cost control. Do cost forecast, cost control goal set,must be ahead of the labor, material, cost forecasting, construction scheme ofchange of the cost forecast and the prediction of auxiliary construction cost.Cost control should follow the principle of conservation and comprehensivecontrol, there are some effective ways to realize the cost control, forexample, take organizational measures to control the project cost, take technicalmeasures to control the project cost, to take economic measures to control theproject cost, strengthen quality management and control of rework rate, etc.


Sign in / Sign up

Export Citation Format

Share Document