PARALLEL REAL-TIME OPTIMIZATION: BEYOND SPEEDUP

1999 ◽  
Vol 09 (04) ◽  
pp. 499-509 ◽  
Author(s):  
SELIM G. AKL ◽  
Stefan D. Bruda

Traditionally, interest in parallel computation centered around the speedup provided by parallel algorithms over their sequential counterparts. In this paper, we ask a different type of question: Can parallel computers, due to their speed, do more than simply speed up the solution to a problem? We show that for real-time optimization problems, a parallel computer can obtain a solution that is better than that obtained by a sequential one. Specifically, a sequential and a parallel algorithm are exhibited for the problem of computing the best-possible approximation to the minimum-weight spanning tree of a connected, undirected and weighted graph whose vertices and edges are not all available at the outset, but instead arrive in real time. While the parallel algorithm succeeds in computing the exact minimum-weight spanning tree, the sequential algorithm can only manage to obtain an approximate solution. In the worst case, the ratio of the weight of the solution obtained sequentially to that of the solution computed in parallel can be arbitrarily large.

Energy ◽  
2012 ◽  
Vol 39 (1) ◽  
pp. 54-62 ◽  
Author(s):  
Gene A. Bunin ◽  
Zacharie Wuillemin ◽  
Grégory François ◽  
Arata Nakajo ◽  
Leonidas Tsikonis ◽  
...  

Author(s):  
Zhongyou Wu ◽  
Yaoyu Li

Real-time optimization of wind farm energy capture for below rated wind speed is critical for reducing the levelized cost of energy (LCOE). Performance of model based control and optimization techniques can be significantly limited by the difficulty in obtaining accurate turbine and farm models in field operation, as well as the prohibitive cost for accurate wind measurements. The Nested-Loop Extremum Seeking Control (NLESC), recently proposed as a model free method has demonstrated its great potential in wind farm energy capture optimization. However, a major limitation of previous work is the slow convergence, for which a primary cause is the low dither frequencies used by upwind turbines, primarily due to wake propagation delay through the turbine array. In this study, NLESC is enhanced with the predictor based delay compensation proposed by Oliveira and Krstic [1], which allows the use of higher dither frequencies for upwind turbines. The convergence speed can thus be improved, increasing the energy capture consequently. Simulation study is performed for a cascaded three-turbine array using the SimWindFarm platform. Simulation results show the improved energy capture of the wind turbine array under smooth and turbulent wind conditions, even up to 10% turbulence intensity. The impact of the proposed optimization methods on the fatigue loads of wind turbine structures is also evaluated.


Sign in / Sign up

Export Citation Format

Share Document