scholarly journals A-Team Solving Distributed Resource-Constrained Multi-Project Scheduling Problem

2019 ◽  
Vol 06 (04) ◽  
pp. 423-437
Author(s):  
Piotr Jędrzejowicz ◽  
Ewa Ratajczak-Ropel

In this paper, a multi-agent system (MAS) based on the A-Team concept is proposed to solve the Distributed Resource-Constrained Multi-Project Scheduling Problem (DRCMPSP). In the DRCMPSP, multiple distributed projects are considered. Hence, the local task schedule for each project and a coordination of the shared decisions are considered. The DRCMPSP belongs to the class of the strongly NP-hard optimization problems. Multi-agent system seems the natural way of solving such problems. The A-Team MAS, proposed in this paper, has been built using the JABAT environment where two types of the optimization agents are used: local and global. Local optimization agents are used to find solutions for the local projects, and global optimization agents are responsible for the coordination of the local projects and for finding the global solutions. The approach has been tested experimentally using 140 benchmark problem instances from MPSPLIB library with minimizing the Average Project Delay (APD) as global optimization criterion.

2019 ◽  
Vol 22 (64) ◽  
pp. 123-134
Author(s):  
Mohamed Amine Nemmich ◽  
Fatima Debbat ◽  
Mohamed Slimane

In this paper, we propose a novel efficient model based on Bees Algorithm (BA) for the Resource-Constrained Project Scheduling Problem (RCPSP). The studied RCPSP is a NP-hard combinatorial optimization problem which involves resource, precedence, and temporal constraints. It has been applied to many applications. The main objective is to minimize the expected makespan of the project. The proposed model, named Enhanced Discrete Bees Algorithm (EDBA), iteratively solves the RCPSP by utilizing intelligent foraging behaviors of honey bees. The potential solution is represented by the multidimensional bee, where the activity list representation (AL) is considered. This projection involves using the Serial Schedule Generation Scheme (SSGS) as decoding procedure to construct the active schedules. In addition, the conventional local search of the basic BA is replaced by a neighboring technique, based on the swap operator, which takes into account the specificity of the solution space of project scheduling problems and reduces the number of parameters to be tuned. The proposed EDBA is tested on well-known benchmark problem instance sets from Project Scheduling Problem Library (PSPLIB) and compared with other approaches from the literature. The promising computational results reveal the effectiveness of the proposed approach for solving the RCPSP problems of various scales.


Author(s):  
Yongyi Shou ◽  
Wenjin Hu ◽  
Changtao Lai ◽  
Ying Ying

A multi-agent optimization method is proposed to solve the preemptive resource-constrained project scheduling problem in which activities are allowed to be preempted no more than once. The proposed method involves a multi-agent system, a negotiation process, and two types of agents (activity agents and schedule agent). The activity agents and the schedule agent negotiate with each other to allocate resources and optimize the project schedule. Computational experiments were conducted using the standard project scheduling problem sets. Compared with prior studies, results of the proposed method are competitive in terms of project makespan. The method can be extended to other preemptive resource-constrained project scheduling problems.


Author(s):  
Amirhossein Hosseinian ◽  
Vahid Baradaran

This paper addresses the Multi-Skill Resource-Constrained Project Scheduling Problem with Transfer Times (MSRCPSP-TT). A new model has been developed that incorporates the presence of transfer times within the multi-skill RCPSP. The proposed model aims to minimize project’s duration and cost, concurrently. The MSRCPSP-TT is an NP-hard problem; therefore, a Multi-Objective Multi-Agent Optimization Algorithm (MOMAOA) is proposed to acquire feasible schedules. In the proposed algorithm, each agent represents a feasible solution that works with other agents in a grouped environment. The agents evolve due to their social, autonomous, and self-learning behaviors. Moreover, the adjustment of environment helps the evolution of agents as well. Since the MSRCPSP-TT is a multi-objective optimization problem, the Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is used in different procedures of the MOMAOA. Another novelty of this paper is the application of TOPSIS in different procedures of the MOMAOA. These procedures are utilized for: (1) detecting the leader agent in each group, (2) detecting the global best leader agent, and (3) the global social behavior of the MOMAOA. The performance of the MOMAOA has been analyzed by solving several benchmark problems. The results of the MOMAOA have been validated through comparisons with three other meta-heuristics. The parameters of algorithms are determined by the Response Surface Methodology (RSM). The Kruskal-Wallis test is implemented to statistically analyze the efficiency of methods. Computational results reveal that the MOMAOA can beat the other three methods according to several testing metrics. Furthermore, the impact of transfer times on project’s duration and cost has been assessed. The investigations indicate that resource transfer times have significant impact on both objectives of the proposed model


2019 ◽  
Vol 10 (4) ◽  
pp. 1-24
Author(s):  
Mohamed Amine Nemmich ◽  
Fatima Debbat ◽  
Mohamed Slimane

In this article, a novel Permutation-based Bees Algorithm (PBA) is proposed for the resource-constrained project scheduling problem (RCPSP) which is widely applied in advanced manufacturing, production planning, and project management. The PBA is a modification of existing Bees Algorithm (BA) adapted for solving combinatorial optimization problems by changing some of the algorithm's core concepts. The algorithm treats the solutions of RCPSP as bee swarms and employs the activity-list representation and moves operators for the bees, in association with the serial scheduling generation scheme (Serial SGS), to execute the intelligent updating process of the swarms to search for better solutions. The performance of the proposed approach is analysed across various problem complexities associated with J30, J60 and J120 full instance sets of PSPLIB and compared with other approaches from the literature. Simulation results demonstrate that the proposed PBA provides an effective and efficient approach for solving RCPSP.


2019 ◽  
Vol 2019 ◽  
pp. 1-13 ◽  
Author(s):  
Junjie Chen ◽  
Shurong Tong ◽  
Hongmei Xie ◽  
Yafei Nie ◽  
Jingwen Zhang

In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.