A Hierarchy Level Scheme for Quasi-Optimum Fuel Assembly Loading in Boiling Water Reactors

1978 ◽  
Vol 37 (3) ◽  
pp. 296-312 ◽  
Author(s):  
Koichi Sekimizu
Author(s):  
James W. Morgan

The nuclear power industry is faced with determining what to do with equipment and instrumentation reaching obsolescence and selecting the appropriate approach for upgrading the affected equipment. One of the systems in a nuclear power plant that has been a source of poor reliability in terms of replacement parts and control performance is the reactor recirculation pump speed/ flow control system for boiling water reactors (BWR). All of the operating BWR-3 and BWR-4’s use motor-generator sets, with a fluid coupled speed changer, to control the speed of the recirculation water pumps over the entire speed range of the pumps. These systems historically have had high maintenance costs, relative low efficiency, and relatively inaccurate speed control creating unwanted unit de-rates. BWR-5 and BWR-6 recirculation flow control schemes, which use flow control valves in conjunction with two-speed pumps, are also subject to upgrades for improved performance and reliability. These systems can be improved by installing solid-state adjustable speed drives (ASD), also known as variable frequency drives (VFD), in place of the motor-generator sets and the flow control valves. Several system configurations and ASD designs have been considered for optimal reliability and return on investment. This paper will discuss a highly reliable system and ASD design that is being developed for nuclear power plant reactor recirculation water pump controls. Design considerations discussed include ASD topology, controls architecture, accident, transient and hydraulic analyses, potential reactor internals modifications, installation, demolition and economic benefits.


Author(s):  
Mike Jones ◽  
David J. Nelmes

Alstom Power is executing the steam turbine retrofit of six nuclear units for Exelon Generation in the USA. The existing turbine-generators are an 1800 RPM General Electric design originally rated at 912 MWe and 1098 MWe and powered by Boiling Water Reactors. 18 Low Pressure inner modules will be replaced, with the first due to be installed in March 2010. This project is particularly challenging — the aggressive retrofit installation schedule is compounded by the requirement to handle radioactively contaminated equipment and also comply with demanding regulations applicable to BWR plant. The author’s company has extensive experience in the steam turbine retrofit business, having supplied around 800 retrofit cylinders globally since the 1970’s. However, this LP upgrade challenges the established techniques used in the business and requires extraordinary effort. Traditional retrofit engineering and installation principles have been interrogated and developed to meet the specific requirements of this project. Innovative techniques are introduced, including the extensive use of the Leica HDS 6000 laser scanner to model the existing plant. The approach has advanced the field of steam turbine retrofit design and installation significantly. The first section of this paper focuses on the extraordinary considerations of the project and the challenges surrounding BWR plant. The second part describes the laser scanning technique and the application of scan data. It outlines the innovative solutions which have been developed.


Sign in / Sign up

Export Citation Format

Share Document