Framework and systematic functional criteria for integrated work processes in complex assets: a case study on integrated planning in offshore oil and gas production industry
2012 ◽
Vol 1
(1)
◽
pp. 49
◽
Keyword(s):
1974 ◽
Vol 188
(1)
◽
pp. 11-24
◽
2017 ◽
Vol 18
(4)
◽
pp. 991-1008
◽
Keyword(s):
2011 ◽
Vol 62
(12)
◽
pp. 2836-2844
◽
Keyword(s):
Keyword(s):
Keyword(s):