Solving inland container ship stowage planning problem on full route through a two-phase approach

2020 ◽  
Vol 12 (1/2) ◽  
pp. 65
Author(s):  
Jun Li ◽  
Yu Zhang ◽  
Sanyou Ji ◽  
Lanbo Zheng
2016 ◽  
Vol 23 (s1) ◽  
pp. 152-159
Author(s):  
Shen Yifan ◽  
Zhao Ning ◽  
Mi Weijian

Abstract Stowage planning is the core of ship planning. It directly influences the seaworthiness of container ship and the handling efficiency of container terminal. As the latter step of container ship stowage plan, terminal stowage planning optimizes terminal cost according to pre-plan. Group-Bay stowage planning is the smallest sub problem of terminal stowage planning problem. A group-bay stowage planning model is formulated to minimize relocation, crane movement and target weight gap satisfying both ship owner and container terminal. A GA-A* hybrid algorithm is designed to solve this problem. Numerical experiment shown the validity and the efficiency.


2014 ◽  
Vol 30 ◽  
pp. 225-234 ◽  
Author(s):  
Kung-Jiuan Yang ◽  
Tzung-Pei Hong ◽  
Guo-Cheng Lan ◽  
Yuh-Min Chen

Sign in / Sign up

Export Citation Format

Share Document