scholarly journals Fire and Life Safety Evaluation & Analysis- Bonderson Engineering Projects Center

2015 ◽  
Author(s):  
Garrett Brown
Author(s):  
Yonghong Yang ◽  
Yu Chen ◽  
Zude Tang

Increasing traffic volume and insufficient road lanes often require municipal roads to be reconstructed and expanded. Where a road passes under a bridge, the reconstruction and expansion project will inevitably have an impact on the bridge. To evaluate the safety impact of road engineering projects on bridges, this paper evaluates the safety of the roads and ancillary facilities of highway bridges involved in municipal road engineering projects. Based on a comprehensive analysis of the safety factors of municipal roads undercrossing existing bridges, a fuzzy comprehensive analytic hierarchy process (AHP) evaluation method for the influence of road construction on the safety of existing bridges is proposed. First, AHP is used to select 11 evaluation factors. Second, the target layer, criterion layer, and index layer of evaluation factors are established, then a safety evaluation factor system is formed. The three-scale AHP model is used to determine the weight of assessment indexes. Third, through the fuzzy comprehensive AHP evaluation model, the fuzzy hierarchical comprehensive evaluation is carried out for the safety assessment index system. Finally, the fuzzy comprehensive evaluation method is applied to the engineering example of a municipal road undercrossing an existing expressway bridge. The comprehensive safety evaluation of the existing bridge reflects the practicability and feasibility of the method. It is expected that, with further development, the method will improve the decision-making process in bridge safety assessment systems.


2021 ◽  
Vol 35 (2) ◽  
pp. 67-73
Author(s):  
Kwang-Tae Son ◽  
Jong-Yeong Son ◽  
Young-Hoon Bae ◽  
Jun-Ho Choi

In this paper, fire and evacuation simulations are conducted for the Multi-Layer Ceramic Capacitor (MLCC) factory clean room, and a plan to improve performance standards in the field of performance-based design simulation is suggested. First of all, fire and evacuation risk factors in the clean room were derived through fire accidents and previous research. And fire and evacuation simulations were performed using the derived risk factors as variables. As a result of the simulations, it was found that 'air conditioning equipment', 'working capacity', 'door setting method' and 'life safety evaluation method' have an influence on the life safety evaluation. Finally, a plan to improve the standards for fire and evacuation simulation was suggested to reflect the factors influencing the life safety evaluation.


Sign in / Sign up

Export Citation Format

Share Document