scholarly journals Preparation process for implantation of the quality management system: study of the difficulties from viewpoint of quality management department staff

2016 ◽  
Vol 11 (4) ◽  
pp. 61-82 ◽  
Author(s):  
Jaiane Aparecida Pereira ◽  
Denise Alves Graciano ◽  
Reginaldo Aparecido Verri
10.12737/304 ◽  
2013 ◽  
Vol 2 (1) ◽  
pp. 0-0 ◽  
Author(s):  
Баурина ◽  
Svetlana Baurina

In this article it considers the process of technological preparation of production in quality management system of an industrial enterprise. Gives a brief characteristics of the main stages of the technological preparation process of production system in quality management system of enterprise.


2018 ◽  
Vol 3 (01) ◽  
pp. 45
Author(s):  
Nur Hidayat ◽  
Indah Kusuma Hayati

Recently, the evolvement of globalization era has been the global challenges that cannot be avoided either by private or government sectors, and they are requested to be survived encountering such the condition. The implementation of Quality Management System (QMS) in the operational company is the way how to guarantee the quality of products or services offered to the people. One of the purposes of QMS implementation is to provide a prime satisfaction to the customers. The impact of QMS implementation is expected to increase job performance of the employees. Besides the implementation of Quality Management System (QMS), the impact of global challenges has been increasing the competitive efforts to execute more effective production process. However, it has required manpower protection accordingly. This research aims to find out whether the implementation of quality management system and safety and healthy at work management system have impacted on the job performance of employees. Objects of this research are the employees in the production department at PT Guna Senaputra Sejahtera Plant 1 Bogor. Data analysis technique of this research has applied software Smart PLS (Partial Least Square). PLS has estimated a model of correlation among the latent variables and correlation between latent variables and its indicators. Result of data processing has indicated that the implementation of Quality Management System (QMS) and system of safety and healthy at work have positively and significantly impacted job performance of employees.Keywords : Quality Management System (QMS), Safety and Healthy at Work System ( SHWS / SMK3), and Job Performance of Employees


2012 ◽  
pp. 1083-1088
Author(s):  
O.H. Ando Junior ◽  
M.O. Oliveira ◽  
J.M. Neto ◽  
A.D. Spacek ◽  
R.C.B. Leborgne ◽  
...  

2020 ◽  
Vol 14 (3) ◽  
pp. 805-816
Author(s):  
Zdravko Krivokapić ◽  
◽  
Miladin Stefanović

2010 ◽  
Vol 4 (4) ◽  
pp. 1-10
Author(s):  
Hajer Ben Mahmoud ◽  
Raouf Ketata ◽  
Taieb Ben Romdhane ◽  
Samir Ben Ahmed

Author(s):  
Konstantin S. Varaksin ◽  
◽  
Artem S. Makarov ◽  
Alexander Y. Lyapin ◽  
◽  
...  

The updated edition of the ISO/IEC 17025 standard introduced significant changes to the structure, terminology, resource requirements, processes, quality management system of testing and calibration laboratories. New requirements were established for the organization of laboratory activities – a process approach and risk-based thinking, which provides for a reduction in part of the prescriptive requirements and the introduction of requirements based on the analysis of the performance of actions. In accordance with GOST ISO IEC 17025-2019, the laboratory must authorize personnel to perform specific laboratory activities, as well as guarantee their competence. This article discusses the organization of the competence management system for the personnel of the laboratories of the organizations of Transneft system using the laboratory information management system (LIMS). The model of the process implementation has been described. It has been established that the competence test system allows you to regularly monitor the skills and knowledge of laboratory workers both in terms of the elements of the Quality Management System and in the applied measurement (test) methods. The personnel responsibility matrix implemented in LIMS regulates the powers and functionality of employees, ensuring that employees are allowed to perform work in accordance with their competence. The functions implemented in LIMS made it possible to automate the management of the competence of laboratory workers in accordance with the requirements of GOST ISO/IEC 17025-2019 and other regulatory documents.


Sign in / Sign up

Export Citation Format

Share Document