Integrated Generation and Transmission Planning with Intermittent Renewable Energy Sources in High-Level Hydroelectric Generation Systems

2015 ◽  
Vol 10 (3) ◽  
pp. 404
Author(s):  
Mario Alberto Rios ◽  
Alexandra Moreno Garzon
Energies ◽  
2021 ◽  
Vol 14 (20) ◽  
pp. 6643
Author(s):  
Ilman Sulaeman ◽  
Desmon Petrus Simatupang ◽  
Brandon Kristiano Noya ◽  
Amalia Suryani ◽  
Niek Moonen ◽  
...  

Although Indonesia’s electrification ratio reached 99.2% in 2020, it has shown stagnating electrification since 2018. This is because most of the remaining areas that need to be electrified are remote and have unique characteristics that hamper implementation of microgrids for providing energy access. Furthermore, not only the deployment but also the long-term sustainability of microgrids is crucial for ensuring continuity of energy access. This paper aims to investigate the scaling and sustainability challenges of remote microgrid development in Indonesia by analyzing microgrids in the Maluku and North Maluku provinces. This study is a two-part publication; the first part focuses on identifying challenges in Indonesia’s remote microgrid development, while the second part focuses on potential technology solutions. In the first part, an assessment of energy access within a multi-tier framework was conducted, which was then analyzed using a multi-dimensional (institutional, social, technical, economic, environmental, and policy) approach adapted from the literature. The framework was expanded by mapping the challenges onto specific phases of the microgrid development, which is intended to be helpful for the parties involved in specific phases. It is shown that the challenges related to unclear land status, lack of social engagement, preliminary survey, technical and practical knowledge, and O&M procedures—especially for remote microgrids with renewable energy sources—are the most prominent issues. Additionally, issues caused by electrical events and environmental conditions such as relatively humid and high-temperatures, and uncontrolled vegetation, rodents, insects, and lizards are often found. Furthermore, a high-level technological outlook to address some of these issues is presented.


IEEE Access ◽  
2020 ◽  
Vol 8 ◽  
pp. 190277-190299
Author(s):  
Md. Shafiul Alam ◽  
Fahad Saleh Al-Ismail ◽  
Aboubakr Salem ◽  
Mohammad A. Abido

IEE Review ◽  
1991 ◽  
Vol 37 (4) ◽  
pp. 152
Author(s):  
Kenneth Spring

2020 ◽  
Vol 1 (2) ◽  
pp. 189-193
Author(s):  
Aisha Naiga ◽  
Loyola Rwabose Karobwa

Over 90% of Uganda's power is generated from renewable sources. Standardised Implementation Agreements and Power Purchase Agreements create a long-term relationship between Generating Companies and the state-owned off-taker guaranteed by Government. The COVID-19 pandemic and measures to curb the spread of the virus have triggered the scrutiny and application of force majeure (FM) clauses in these agreements. This article reviews the FM clauses and considers their relevance. The authors submit that FM clauses are a useful commercial tool for achieving energy justice by ensuring the continuity of the project, despite the dire effects of the pandemic. Proposals are made for practical considerations for a post-COVID-19 future which provides the continued pursuit of policy goals of promoting renewable energy sources and increasing access to clean energy, thus accelerating just energy transitions.


2016 ◽  
Vol 136 (5) ◽  
pp. 459-470 ◽  
Author(s):  
Yuki Tsujii ◽  
Takao Tsuji ◽  
Tsutomu Oyama ◽  
Yoshiki Nakachi ◽  
Suresh Chand Verma

Sign in / Sign up

Export Citation Format

Share Document