scholarly journals Scheduling of Construction Projects under Resource-Constrained Conditions with a Specifically Developed Software using Genetic Algorithms

2021 ◽  
Vol 28 (4) ◽  
2003 ◽  
Vol 13 (05) ◽  
pp. 1055-1161 ◽  
Author(s):  
MAKOTO ITOH ◽  
LEON O. CHUA

In this paper, canonical isolated CNN cell models are proposed by using implicit differential equations. A number of equivalent but distinct CNN cell models are derived from these canonical models. Almost every known CNN cell model can be classified into one or more groups via constrained conditions. This approach is also applied to discrete-time CNN cell models. Pattern formation mechanisms are investigated from the viewpoint of equivalent templates and genetic algorithms. A strange wave propagation phenomenon in nonuniform CNN cells is also presented in this paper. Finally, chaotic associative memories are proposed.


2020 ◽  
Vol 12 (21) ◽  
pp. 8918
Author(s):  
Kyunghwan Kim

Delays by limited supply of resources are common in many construction projects and may cause serious monetary disputes between project participants. Since the dispute resolution may require unnecessary additional time and cost, preventing delays in advance is an important goal in sustainable construction project management. To prevent delays, a feasible plan must be implemented, which reflects limited resources and provides reliable activity information. For this purpose, this study proposes a generalized resource-constrained critical path method (eRCPM). It consists of three steps to identify resource-dependent activity relationships (resource links) based on the result of resource-constrained scheduling (RCS) under multiple resource constraints. Compared to the existing resource-constrained critical path methods, the eRCPM has the advantage of identifying resource links irrespective of the applied RCS technique because it is based on the result rather than the RCS process. Further, this study presents a Microsoft (MS) Excel-based half-automated prototype system that is linked using file export and import functions to both P6 and MS Project software packages. The detailed process of the eRCPM algorithm and the operation process of the prototype system are described using an example schedule. Through a case study, it was demonstrated that eRCPM appropriately identifies the necessary resource links and provides reliable total floats.


Sign in / Sign up

Export Citation Format

Share Document