Assessment of the possibility of nickel and cobalt extraction from sulfuric-acid heap leaching solutions of oxidized nickel ores using the extractan Hydrazex-59

2017 ◽  
pp. 16-21
Author(s):  
A. S. Gavrilov ◽  
◽  
B. D. Khalezov ◽  
Author(s):  
Yelena Panova ◽  
Yermek Aubakirov ◽  
Huseyin Arbag

Oxidized nickel ores account for the majority of industrial ores suitable for nickel production. The processing of such ores using traditional pyrometallurgical technology is not economically viable due to the low nickel content. One of the most cost-effective methods of processing oxidized nickel ores is sulfuric acid leaching technology followed by sorption extraction. The aim of this work is to establish the kinetic and thermodynamic parameters of the sorption extraction of nickel and cobalt using iminodiacetate chelating ion-exchange sorbents from various manufacturers, to select a desorbing solution and to determine the degree of desorption. The sorption of nickel and cobalt was carried out in a weakly acidic medium from a model solution containing impurities of other metals in static and dynamic modes. The limiting sorption capacity for the studied sorbents is 18-26 mg/g for nickel and 1-2 mg/g for cobalt in the static mode. The sorption capacity in the dynamic mode for nickel is equal to 25.5 g/L for Purolite S 930, 29.2 g/L for Lewatit TP 207, 1.4 g/L, and 1.8 g/L for cobalt, respectively. The best desorption parameters are achieved when using a 2 M sulfuric acid solution. The degree of desorption for sorbents Purolite S 930 and Lewatit TP 207 exceeds 90%. The use of the Lewatit TP 207 sorbent for the extraction of nickel from the leaching solution of nickel ore of the Gornostaevskoye deposit in 5 cycles made it possible to obtain a commercial desorbate with a nickel content of 18 g/L. The use of a part of the commercial desorbate obtained in the previous cycle, further strengthened to the initial concentration of sulfuric acid, for re-extracting nickel from the saturated sorbent during a cyclic process leads to a deterioration in desorption characteristics. It is recommended to remove the commercial desorbate from the process after several cycles of desorption and supply new solution of sulfuric acid for desorption to restore the sorption parameters.


2020 ◽  
Author(s):  
Alexander M. Klyushnikov ◽  
Evgeny N. Selivanov

The technological scheme of processing of nickel and copper ores from the Urals deposits is substantiated, including calcination of oxidized nickel ore with limestone, partial oxidative roasting of sulfide copper ore, blending of calcines with coke, and melting of charge to obtain copper-nickel matte. The implementation of the scheme will increase the complexity of possible uses of raw materials and ensure a high environmental protection level. A feasibility study was carried out for the organization of industrial enterprise, which entailed the joint processing of oxidized nickel ores and sulfide copper ores with a capacity of 700,000 tons per year of a mixture of initial ores, including 400,000 tonnes of nickel ore and 300,000 tonnes of copper ore (dry weight). Finished products are: copper-nickel matte, containing not less than, wt.%: 3.3 Cu, 4.7 Ni, 0.6 Co, 1.5 g/t Au, 2.6 g/t Ag; granular slag containing, wt.%: 0.01–0.02 Ni, 0.01–0.02 Cu, 0.01–0.06 Co, 13–16 Fe, 44–50 SiO2, 13–14 MgO, 4–5 Al 2O3, 9–11 CaO; and technical grade sulfuric acid (mass fraction of monohydrate not less than 92.5 %). The planned enterprise is expected to produce the following annual volumes of finished products (not less than): 94,900 tonnes of matte; 512,300 tonnes of granular slag; and 235,500 tonnes of technical grade sulfuric acid. The estimated period of project implementation is 13 years. The total amount of investment costs is 1407 million roubles, current costs for the annual production program are 3820 million roubles. The financial results of the investment project are characterized by the following indicators: net profit is 5,735.5 million roubles, net discounted income is 1546.6 million roubles, the profitability index of discounted investments is 2.1, the internal rate of return is 36.4 %, and the discounted payback period is 5.5 years. The results indicate the viability and economic efficiency of the project. Keywords: ore, processing, sulfides, oxides, copper, nickel, cobalt, smelting, extraction, products, economy, indicators, efficiency


2019 ◽  
Vol 20 (2) ◽  
pp. 70-75
Author(s):  
A.S. Gavrilov ◽  
◽  
B. D. Khalezov ◽  
A. V. Radushev ◽  
D. S. Reutov ◽  
...  

2021 ◽  
Vol 410 ◽  
pp. 394-399
Author(s):  
Olga Yu. Makovskaya ◽  
Nadezhda I. Bryantseva

The possibility of sorption extraction of nickel from leaching solutions of oxidized nickel ores of the Buruktal deposit is considered. Ionite Lewatit TP220 with bis-picolylamine functional groups is effective for nickel recovery against the background of high iron contents. Lewatit TP220 is mechanically strong enough for use in the resin-in-pulp process. Nickel sorption with satisfactory performance occurs both in the variant of sorption leaching and extraction from clarified solutions. At sorption from the pulp, the capacity for nickel was 5.44 mg/g, for iron, 25.17 mg/g. The use of 20% sulfuric acid provides quantitative nickel desorption. To obtain a higher quality nickel-containing product, it is recommended to additionally purify the resulting eluates from iron.


2021 ◽  
pp. 33-38
Author(s):  
O. B. Kolmachikhina ◽  
V. G. Lobanov ◽  
S. E. Polygalov ◽  
O. Yu. Makovskaya

2018 ◽  
pp. 57-62
Author(s):  
G. L. Pashkov ◽  
◽  
I. Yu. Fleitlikh ◽  
N. A. Grigorieva ◽  
M. A. Pleshkov ◽  
...  

2018 ◽  
pp. 52-56
Author(s):  
G. L. Pashkov ◽  
◽  
M. V. Panteleeva ◽  
S. V. Saikova ◽  
D. I. Saikova ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document