Predictive and comparative analysis of NPP modernization with an autonomous hydrogen power complex and gas turbine unit

2021 ◽  
Vol 3 ◽  
pp. 22-30
Author(s):  
Valery Yurin ◽  
Dmitry Bashlykov

Optimizing existing nuclear power plants adding developing power technology can help find effective ways of improving variable power loads in an electric power system. One of the most promising options is combining a nuclear power plant with a newly developed autonomous hydrogen complex reported in our research. The ability of storing unused energy and releasing it when needed will raise contribution of nuclear power plants in compensating improving variable power loads, shorten emissions as well as contribution of conventional thermal power plants into electric power generation. Also, as we demonstrated in our previous research results, a low-power steam turbine plant used in the said autonomous hydrogen complex can support an auxiliary power system of a nuclear power plant reusing residual reactor heat in case of an outage.

2021 ◽  
Vol 8 (2) ◽  
pp. 290
Author(s):  
Shaleh Raed Shatat ◽  
Ade Riusma Ariyana ◽  
Devina Arifani

The states Nuclear Program is a program to build and utilize nuclear science and technology both in the non-energy sector and in the energy sector for peaceful purposes. Utilization of non-energy in Indonesia has developed quite advanced. The use of nuclear power in every countries covers various fields such as health, research and industry. Indonesia's readiness in implementing nuclear energy is carried out by ratifying international conventions, issuing laws, and issuing regulations from the Nuclear Energy Supervisory Agency, readiness in the field of infrastructure used to strengthen technology, and in Indonesia is committed to reducing 26% of greenhouse gas emissions in the year 2020. A nuclear power plant or nuclear power plant is a thermal power plant that uses one or more nuclear reactors as a heat source. The working principle of a nuclear power plant is almost the same as a steam power plant, using high pressure steam to turn a turbine. The rotation of the turbine is converted into electrical energy. The difference is the heat source used to generate heat. A nuclear power plant uses uranium as its heat source. The fission reaction (fission) of the uranium nucleus produces enormous heat energy. The power of a nuclear power plant ranges from 40 MWe to 2000 MWe, and a nuclear power plant built in 2005 has a power distribution from 600 MWe to 1200 MWe. As of 2015 there are 437 nuclear power plants operating in the world, which in total generate about 1/6 of the world's electrical energy. To date, around 66 nuclear power plants are being built in various countries, including China with 28 units, Russia with 11 units, India with 7 units, the United Arab Emirates with 4 units, South Korea with 4 units, Pakistan and Taiwan with 2 units each. Nuclear power plants are categorized based on the type of reactor used. However, in some plants that have several separate reactor units, it is possible to use reactor types that are fueled such as Uranium and Plutonium.


2017 ◽  
Vol 2017 ◽  
pp. 1-11 ◽  
Author(s):  
Sang-Hyun Lee ◽  
Choong-Koo Chang

In order to supply electric power to the safety related loads, safety and reliability of onsite power have to be ensured for the safety function performance in nuclear power plants. Even though the existing electric power system of APR1400 meets the requirements of codes regarding Class 1E system, there is a room for improvement in the design margin against the voltage drop and short circuit current. This paper discusses the amount that the voltage drop and short circuit current occur in the existing electric power system of APR1400. Additionally, this paper studies with regard to the improved model that has the extra margin against the high voltage drop and short circuit current by separation of unit auxiliary transformer (UAT) and standby auxiliary transformer (SAT) for the Class 1E loads. The improved model of the electric power system by separation of UAT and SAT has been suggested through this paper. Additionally, effects of reliability and cost caused by the electric power system modification are considered.


Energies ◽  
2021 ◽  
Vol 14 (14) ◽  
pp. 4119
Author(s):  
Sejin Baek ◽  
Gyunyoung Heo

Because the scope of risk assessments at nuclear power plants (NPPs) is being extended both spatially and temporally, conventional, or static fault trees might not be able to express failure mechanisms, or they could be unnecessarily conservative in their expression. Therefore, realistic assessment techniques are needed to adequately capture accident scenarios. In multi-unit probabilistic safety assessment (PSA), fault trees naturally become more complex as the number of units increases. In particular, when considering a shared facility between units of the electric power system (EPS), static fault trees (SFTs) that prioritize a specific unit are limited in implementing interactions between units. However, dynamic fault trees (DFTs) can be available without this limitation by using dynamic gates. Therefore, this study implements SFTs and DFTs for an EPS of two virtual NPPs and compares their results. In addition, to demonstrate the dynamic characteristics of the shared facilities, a station blackout (SBO), which causes the power system to lose its function, is assumed—especially with an inter-unit shared facility, AAC DG (Alternate AC Diesel Generator). To properly model the dynamic characteristics of the shared EPS in DFTs, a modified dynamic gate and algorithm are introduced, and a Monte Carlo simulation is adopted to quantify the DFT models. Through the analysis of the DFT, it is possible to confirm the actual connection priority of AAC DG according to the situation of units in a site. In addition, it is confirmed that some conservative results presented by the SFT can be evaluated from a more realistic perspective by reflecting this.


2020 ◽  
Vol 11 (7-2020) ◽  
pp. 72-81
Author(s):  
Nikolai M. Kuznetsov ◽  
◽  
Valerii A. Minin ◽  

The determining value of the Kola NPP in the structure of the Kola electric power system is shown. The mutually complementary operation of the 1,760 MW KAES with seventeen hydroelectric power stations with a capacity of about 1,600 MW and two 240 MW thermal power plants makes the region's power supply system unique, producing the cheapest electricity in the North-West of Russia. The issues related to the further extension of the operating life of the existing nuclear power plant and the construction of theKola NPP-2 in the future are considered.


2021 ◽  
Author(s):  
Li Liang ◽  
Pan Rong ◽  
Ren Guopeng ◽  
Zhu Xiuyun

Abstract Almost all nuclear power plants in the world are equipped with seismic instrument system, especially the third generation nuclear power plants in China. When the ground motion measured by four time history accelerometers of containment foundation exceeds the preset threshold, the automatic shutdown trigger signal will be generated. However, from the seismic acceleration characteristics, isolated and prominent single high frequency will be generated the acceleration peak, which has no decisive effect on the seismic response, may cause false alarm, which has a certain impact on the smooth operation of nuclear power plant. According to the principle of three elements of ground motion, this paper puts forward a method that first selects the filtering frequency band which accords with the structural characteristics of nuclear power plants, then synthesizes the three axial acceleration time history, and finally selects the appropriate acceleration peak value for threshold alarm. The results show that the seismic acceleration results obtained by this method can well represent the actual magnitude of acceleration, and can solve the problem of false alarm due to the randomness of single seismic wave, and can be used for automatic reactor shutdown trigger signal of seismic acceleration.


2021 ◽  
Vol 2083 (2) ◽  
pp. 022020
Author(s):  
Jiahuan Yu ◽  
Xiaofeng Zhang

Abstract With the development of the nuclear energy industry and the increasing demand for environmental protection, the impact of nuclear power plant radiation on the environment has gradually entered the public view. This article combs the nuclear power plant radiation environmental management systems of several countries, takes the domestic and foreign management of radioactive effluent discharge from nuclear power plants as a starting point, analyses and compares the laws and standards related to radioactive effluents from nuclear power plants in France, the United States, China, and South Korea. In this paper, the management improvement of radioactive effluent discharge system of Chinese nuclear power plants has been discussed.


2018 ◽  
Vol 4 (4) ◽  
pp. 251-256 ◽  
Author(s):  
Sergey Shcheklein ◽  
Ismail Hossain ◽  
Mohammad Akbar ◽  
Vladimir Velkin

Bangladesh lies in a tectonically active zone. Earlier geological studies show that Bangladesh and its adjoining areas are exposed to a threat of severe earthquakes. Earthquakes may have disastrous consequences for a densely populated country. This dictates the need for a detailed analysis of the situation prior to the construction of nuclear power plant as required by the IAEA standards. This study reveals the correlation between seismic acceleration and potential damage. Procedures are presented for investigating the seismic hazard within the future NPP construction area. It has been shown that the obtained values of the earthquake’s peak ground acceleration are at the level below the design basis earthquake (DBE) level and will not lead to nuclear power plant malfunctions. For the most severe among the recorded and closely located earthquake centers (Madhupur) the intensity of seismic impacts on the nuclear power plant site does not exceed eight points on the MSK-64 scale. The existing predictions as to the possibility of a super-earthquake with magnitude in excess of nine points on the Richter scale to take place on the territory of the country indicate the necessity to develop an additional efficient seismic diagnostics system and to switch nuclear power plants in good time to passive heat removal mode as stipulated by the WWER 3+ design. A conclusion is made that accounting for the predicted seismic impacts in excess of the historically recorded levels should be achieved by the establishment of an additional efficient seismic diagnostics system and by timely switching the nuclear power plants to passive heat removal mode with reliable isolation of the reactor core and spent nuclear fuel pools.


Author(s):  
Esko Pekkarinen

Modernisation of control rooms of the nuclear power plants has been a major issue during the last few years. With this as a basis, the BWR plants in Sweden and Finland funded, in co-operation with the Halden Project, an experimental HAMBO BWR simulator project based on the Forsmark 3 plant in Sweden. VTT Energy in Finland developed the simulator models for HAMBO with the aid of their APROS tool, while the operator interface was developed by the Halden Project. The simulator and its performance have been described in other publications [1, 2]. On July 25th 2006 there was a short circuit at Forsmark 1 nuclear power plant when manoeuvring equipment in the 400kV-switch yard. Due to the short circuit, the plant suffered an electrical disturbance that led to scram and failure of two out of four diesel generators. The purpose of the study carried out at VTT in 2007 was to assess the capabilities of the HAMBO BWR simulator to handle Forsmark 1 type of events in different nuclear power plants (Forsmark 3 in this case). The Forsmark 1 incident showed (among other things) that the intention to protect certain components (in this case the UPS-system) can in certain situations affect negatively to the safety functions. It is concluded that most of this type of BWR transients may be simulated to a certain extent using the existing HAMBO- and APROS- models. A detailed modelling of the automation and electric systems is required sometimes if the complex interplay between these systems and the process is to be predicted reliably. The modelling should be plant specific and level of detail should be assessed case-by-case (i.e. what kind of transient is in question, what systems are available, what is the main purpose of the analyses etc.). The thermal-hydraulic models of the APROS-code seem to replicate well the real behaviour of thermal-hydraulic process provided that there is enough information about the transient in consideration.


Author(s):  
Walter Krämer ◽  
Gerhard Arminger

SummaryFor decades, there has been a heated debate about whether or not nuclear power plants contribute to childhood cancer in their respective neighbourhoods, with statisticians testifying on both sides. The present paper points to some flaws in the pro-arguments, taking a recent study prepared for the political party “Bündnis 90 /Grüne” as a specimen. Typical mistakes include an understatement of the size of tests of significance, disregard of important covariates and extreme reliance on very few selected data points.


Sign in / Sign up

Export Citation Format

Share Document