Comprehensive Evaluation of Power Grid Planning in Coastal Regions of China in the Context of Power Internet of Things (PIoT)

2021 ◽  
Vol 37 (4) ◽  
Author(s):  
Xin Ai ◽  
Lu Zhao
2013 ◽  
Vol 756-759 ◽  
pp. 2663-2667
Author(s):  
Jian Xun Qi ◽  
Shu Liang Liu ◽  
Juan Li Wang

On the basis of discussing the basic features of rural power grid planning project and the status quo, this paper has constructed evaluation index system of the rural power grid planning project, and based on the characteristics of its particularity and indicators, established a fuzzy comprehensive evaluation model based on set pair analysis. It has carried on the comprehensive evaluation to some county in power grid planning project to verify the validity of the selected method. It will provide referential basis for the scientific decision of county power enterprises.


2012 ◽  
Vol 214 ◽  
pp. 464-468
Author(s):  
Meng Lan Huang ◽  
Yao Xian Li

As the asset belongs to relations reasons, among China's urban power grid planning and municipal planning, lack of coordination, to some extent, restricted the construction and development of the urban grid, thus constraining the urban social and economic development. According to the characteristics of network planning and urban planning, both the coordinated planning processed. Design a set of network planning and urban planning the coordinated development of comprehensive evaluation index system, the combination of G1 method, entropy method, layer by layer Scatter comprehensive evaluation model, and five typical city grid with the city and coordinated planning empirical analysis and evaluation, to prove the accuracy of the evaluation model The city grid and urban planning, coordination mechanisms and evaluation model for the coordinated planning of China's urban power grids to provide a scientific basis for decision making.


2021 ◽  
Vol 2083 (3) ◽  
pp. 032023
Author(s):  
Le Zhang

Abstract Traditional data collection and review methods in power grid planning have always had the problems of time-consuming, poor real-time performance, and cumbersome processes. The application of mobile GIS solves the problems of data collection and review methods and makes more efficient use of mobile GIS terminal collection. The data of the mobile GIS solve the urgent problems that need to be solved since the popularization and application of mobile GIS. This system implements functions such as storage, transmission, and review based on mobile GIS data, which will greatly improve the efficiency of data collection by mobile terminals and reduce the cost of data collection. Realize the planning simulation of the power grid under the intelligent cycle of the whole scene.


Sign in / Sign up

Export Citation Format

Share Document