Urucu Field Integrated Production Model

Author(s):  
Sthener R.V. Campos ◽  
Alex F. Teixeira ◽  
Leonardo F. Vieira ◽  
Snjezana Sunjerga
2021 ◽  
Author(s):  
Oleksandr Doroshenko ◽  
Miljenko Cimic ◽  
Nicholas Singh ◽  
Yevhen Machuzhak

Abstract A fully integrated production model (IPM) has been implemented in the Sakhalin field to optimize hydrocarbons production and carried out effective field development. To achieve our goal in optimizing production, a strategy has been accurately executed to align the surface facilities upgrade with the production forecast. The main challenges to achieving the goal, that we have faced were:All facilities were designed for early production stage in late 1980's, and as the asset outdated the pipeline sizes, routing and compression strategies needs review.Detecting, predicting and reducing liquid loading is required so that the operator can proactively control the hydrocarbon production process.No integrated asset model exists to date. The most significant engineering tasks were solved by creating models of reservoirs, wells and surface network facility, and after history matching and connecting all the elements of the model into a single environment, it has been used for the different production forecast scenarios, taking into account the impact of infrastructure bottlenecks on production of each well. This paper describes in detail methodology applied to calculate optimal well control, wellhead pressure, pressure at the inlet of the booster compressor, as well as for improving surface flowlines capacity. Using the model, we determined the compressor capacity required for the next more than ten years and assessed the impact of pipeline upgrades on oil gas and condensate production. Using optimization algorithms, a realistic scenario was set and used as a basis for maximizing hydrocarbon production. Integrated production model (IPM) and production optimization provided to us several development scenarios to achieve target production at the lowest cost by eliminating infrastructure constraints.


2011 ◽  
Author(s):  
Chidi Amudo ◽  
Stuart Walters ◽  
Daniel Ian O'Reilly ◽  
Martyn Clough ◽  
Joshua Paul Beinke ◽  
...  

2009 ◽  
Author(s):  
Fabiola Czwienzek ◽  
Javier Jose Barreto Perez ◽  
Javier Salve ◽  
Ismael Martinez Ramirez ◽  
Miguel Gerardo Vasquez ◽  
...  

2012 ◽  
Author(s):  
Arthur Edward Stevenson ◽  
Eze P. Wanorue ◽  
Ezioge Chijioke Okoro ◽  
Ozgur Ozen

Author(s):  
I.S. Senkin ◽  
L.I.. Akmadieva ◽  
E.V. Belonogov

The article discusses a new technique for optimizing the calculations of the integrated model, all stages of the calculations are analyzed. The analysis of the necessary input data for the integrated model is carried out and the definition of the calculation results according to the obtained method is given. Comparison of calculations using the developed method and a commercial package is obtained. Opportunities for applying the obtained solution are proposed.


Sign in / Sign up

Export Citation Format

Share Document