Car Setup Optimization Using Multi-Objective Swarm Algorithms

2016 ◽  
Author(s):  
M. C. Oliveira Junior ◽  
M. G. P. Lacerda ◽  
E. A. Barboza ◽  
P. R. G. Cordeiro ◽  
C. J. A. Bastos-Filho
2019 ◽  
Vol 9 (3) ◽  
pp. 588 ◽  
Author(s):  
Muhammad Farooq ◽  
Qazi Salman ◽  
Muhammad Arshad ◽  
Imran Khan ◽  
Rehman Akhtar ◽  
...  

Modern day industries strive to obtain long-term supplier integrations (SI) with potentially stronger supplier groups, to achieve fast and reliable production. This paper studies the process of selecting vendors, while simultaneously considering the aspects of random factors, multiple criteria, and efficiently reaching optimal solutions to improve the SI. A framework was developed that consists of three layers of expert opinions, supplier requirements, and multi-objective bee colony optimization. The model factors affecting the SI decision were explored from the comprehensive relevant literature, and these factors were shortlisted and prioritized. Routines for the modeled framework were coded by using the proposed algorithms which were implemented for a real-world problem from a manufacturing small and medium enterprise (SME) in Pakistan. Optimization of SI was carried out on an archived artificial bee colony (AABC). Its effectiveness was also evaluated by comparison with simple artificial bee colony (ABC) and particle swarm algorithms. The methodologically calculated results, obtained from simulation of a mathematically reinforced optimization framework, are highly beneficial for the industry, as well as local and international suppliers. A detailed and in-depth evaluation of suppliers was provided by the sensitivity analysis, which presented a more rigorous authentication and elaboration of the results. The presented framework is the first of its kind for the SMEs of Pakistan and can be applied with little modification to other industries.


Author(s):  
S. N. Omkar ◽  
G. Narayana Naik ◽  
Kiran Patil ◽  
Mrunmaya Mudigere

In this paper, a generic methodology based on swarm algorithms using Artificial Bee Colony (ABC) algorithm is proposed for combined cost and weight optimization of laminated composite structures. Two approaches, namely Vector Evaluated Design Optimization (VEDO) and Objective Switching Design Optimization (OSDO), have been used for solving constrained multi-objective optimization problems. The ply orientations, number of layers, and thickness of each lamina are chosen as the primary optimization variables. Classical lamination theory is used to obtain the global and local stresses for a plate subjected to transverse loading configurations, such as line load and hydrostatic load. Strength of the composite plate is validated using different failure criteria—Failure Mechanism based failure criterion, Maximum stress failure criterion, Tsai-Hill Failure criterion and the Tsai-Wu failure criterion. The design optimization is carried for both variable stacking sequences as well as standard stacking schemes and a comparative study of the different design configurations evolved is presented. Performance of Artificial Bee Colony (ABC) is compared with Genetic Algorithm (GA) and Particle Swarm Optimization (PSO) for both VEDO and OSDO approaches. The results show ABC yielding a better optimal design than PSO and GA.


2013 ◽  
Vol 13 (4) ◽  
pp. 1567-1582 ◽  
Author(s):  
María Arsuaga-Ríos ◽  
Miguel A. Vega-Rodríguez ◽  
Francisco Prieto-Castrillo

2020 ◽  
Vol 39 (5) ◽  
pp. 6339-6350
Author(s):  
Esra Çakır ◽  
Ziya Ulukan

Due to the increase in energy demand, many countries suffer from energy poverty because of insufficient and expensive energy supply. Plans to use alternative power like nuclear power for electricity generation are being revived among developing countries. Decisions for installation of power plants need to be based on careful assessment of future energy supply and demand, economic and financial implications and requirements for technology transfer. Since the problem involves many vague parameters, a fuzzy model should be an appropriate approach for dealing with this problem. This study develops a Fuzzy Multi-Objective Linear Programming (FMOLP) model for solving the nuclear power plant installation problem in fuzzy environment. FMOLP approach is recommended for cases where the objective functions are imprecise and can only be stated within a certain threshold level. The proposed model attempts to minimize total duration time, total cost and maximize the total crash time of the installation project. By using FMOLP, the weighted additive technique can also be applied in order to transform the model into Fuzzy Multiple Weighted-Objective Linear Programming (FMWOLP) to control the objective values such that all decision makers target on each criterion can be met. The optimum solution with the achievement level for both of the models (FMOLP and FMWOLP) are compared with each other. FMWOLP results in better performance as the overall degree of satisfaction depends on the weight given to the objective functions. A numerical example demonstrates the feasibility of applying the proposed models to nuclear power plant installation problem.


Sign in / Sign up

Export Citation Format

Share Document