scholarly journals Continuous Monitoring and Partial Water Softening for Cooling Tower Water Treatment

2020 ◽  
Author(s):  
Gregg Tomberlin ◽  
Jesse Dean ◽  
Michael Deru
2018 ◽  
Vol 378 ◽  
pp. 146-152 ◽  
Author(s):  
Barak Shapira ◽  
Izaak Cohen ◽  
Tirupathi Rao Penki ◽  
Eran Avraham ◽  
Doron Aurbach

2017 ◽  
Vol 6 (1) ◽  
pp. 44-48
Author(s):  
Fitrianti Fitrianti

From year to year the number of oil production will be reduced and the amount of water production will grow, so will cause problems in managing the water. Some of the problems that arise are limitations in the surface water treatment systems, the availability of water treatment chemicals, and declining well productivity. Doing some work over to lower the value of water production and increase the value of oil production, one of which is the partial water shut off. On the hawa field, some job well done partial water shut off. The results of such work nothing works and nothing failed. Analysis performed on the job partial water shut off with the observation of the historycompletion and the processing of data and calculation of the value of production history OOIP to get the value of remaining reserves. After analysis, it was found some causes of work partial water shut off the well would be successful if it fulfills several criteria such as: the value of remaining reserves are still large enough, she had never done work partial water shut off in the layer and selecting the type of isolation right tool. While the cause of such failures is that the well had done work partial water shut off the same perforation interval. The criteria are very important and necessary in deciding the work partial water shut off the a better well done or not.


2017 ◽  
Vol 6 (3) ◽  
pp. 215 ◽  
Author(s):  
Hutriadi Pratama Siallagan

Pada proses produksi baja sangat erat kaitannya dengan pendinginan baik untuk proses pendinginan baja maupun pendinginan mesin-mesin produksi supaya terhindar dari over heat sehingga dapat bekerja dengan optimal. Pada PT Krakatau Steel menggunakan beberapa sistem pendingin salah satunya adalah sistem pendingin cooling tower 8330 CT 01. Sistem pendingin tersebut digunakan untuk menunjang proses produksi dan juga pendinginanan mesin produksi khusunya pada Slab Steel Plant (SSP), dengan peran yang sangat besar maka cooling tower 8330 CT 01 harus diketahui bagaimana kinerjanya. Skripsi ini membahas tentang analisis kinerja Cooling tower 8330 CT 01 dengan membandingkan data teori dengan data aktual berdasarkan perhitungan-perhitungan sehingga dapat diketahui bagaimana kinerja dari Cooling tower 8330 CT 01 tersebut. Dari hasil analisis diperoleh penurunan efisiensi sebesar 22,353%, kapasitas pendinginan 7.033,35 Kj/s, Hal tersebut diakibatkan oleh temperatur air yang masuk Cooling tower 8330 CT 01 tidak terlalu tinggi, karena SSP sedang dalam pengerjaan revitatalisi, agar lebih efektif dan efisien Cooling tower 8330 CT 01 sebaiknya lebih dimamfaatkan lagi untuk pendingin objek lainnya sehingga temperatur air yang masuk tidak terlalu rendah.


Sign in / Sign up

Export Citation Format

Share Document