Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power. Phase I. Preliminary engineering technology support test results, commercial fluid-bed long term erosion/corrosion test in a municipal sewage incinerator
Keyword(s):
Phase I
◽