scholarly journals High temperature turbine technology program. Phase I. Program and system definition. Topical report: overall plant design description, low Btu combined cycle electric power plant

1977 ◽  
Author(s):  
John T. Langaker ◽  
Christopher Hamker ◽  
Ralph Wyndrum

Large natural gas fired combined cycle electric power plants, while being an increasingly efficient and cost effective technology, are traditionally large consumers of water resources, while also discharging cooling tower blowdown at a similar rate. Water use is mostly attributed to the heat rejection needs of the gas turbine generator, the steam turbine generator, and the steam cycle condenser. Cooling with air, i.e. dry cooling, instead of water can virtually eliminate the environmental impact associated with water usage. Commissioned in the fall of 2010 with this in mind, the Halton Hills Generating Station located in the Greater Toronto West Area, Ontario, Canada, is a nominally-rated 700 Megawatt combined cycle electric generating station that is 100 percent cooled using various air-cooled heat exchangers. The resulting water consumption and wastewater discharge of this power plant is significantly less than comparably sized electric generating plants that derive cooling from wet methods (i.e, evaporative cooling towers). To incorporate dry cooling into such a power plant, it is necessary to consider several factors that play important roles both during plant design as well as construction and commissioning of the plant equipment, including the dry cooling systems. From the beginning a power plant general arrangement and space must account for dry cooling’s increase plot area requirements; constraints therein may render air cooling an impossible solution. Second, air cooling dictates specific parameters of major and auxiliary equipment operation that must be understood and coordinated upon purchase of such equipment. Until recently traditional wet cooling has driven standard designs, which now, in light of dry cooling’s increase in use, must be re-evaluated in full prior to purchase. Lastly, the construction and commissioning of air-cooling plant equipment is a significant effort which demands good planning and execution.


Author(s):  
Hemant Gajjar ◽  
Mustapha Chaker ◽  
Ajay Dighe ◽  
Cyrus B. Meher-Homji

The design, installation, commissioning and operation of a fogging system for a large 655 MW combined cycle power plant is described. Technical details and practical installation issues are discussed. Special considerations as to how the fogging system could help in the augmentation of power during high temperature and low frequency operation of the gas turbine is discussed. Finally a discussion is made regarding the importance of inlet filtration and the proper selection of blade coatings.


IEEE Expert ◽  
1987 ◽  
Vol 2 (1) ◽  
pp. 56-66 ◽  
Author(s):  
John J. Jansen ◽  
Hans B. Puttgen

Sign in / Sign up

Export Citation Format

Share Document