scholarly journals Performance evaluation of project management implementation based on PMBOK-2008 standard (case study: Ahvaz Metro project)

2016 ◽  
Vol 3 (9) ◽  
pp. 10-15 ◽  
Author(s):  
Khashayar Bagherinia ◽  
◽  
Masoud Olapour ◽  
2016 ◽  
Author(s):  
S. Asawapayukkul ◽  
R. Laochamroonvorapongse ◽  
M. Pancharoen ◽  
Y. Rattanarujikorn ◽  
V. Tivayanonda ◽  
...  

2021 ◽  
Vol 36 (1) ◽  
pp. 33-43
Author(s):  
Jian-Bin Fang ◽  
Xiang-Ke Liao ◽  
Chun Huang ◽  
De-Zun Dong

Mathematics ◽  
2021 ◽  
Vol 9 (14) ◽  
pp. 1633
Author(s):  
Zhiwu Zhou ◽  
Julián Alcalá ◽  
Víctor Yepes

The aim of this paper is to establish an international framework for sustainable project management in engineering, to make up the lack of research in this field, and to propose a scientific theoretical basis for the establishment of a new project management system. The article adopts literature review, mathematical programming algorithm and case study as the research method. The literature review applied the visual clustering research method and analyzed the results of 21-year research in this field. As a result, the project management system was found to have defects and deficiencies. A mathematical model was established to analyze the composition and elements of the optimized international project management system. The case study research selected large bridges for analysis and verified the superiority and practicability of the theoretical system. Thus, the goal of sustainable development of bridges was achieved. The value of this re-search lies in establishing a comprehensive international project management system model; truly integrating sustainable development with project management; providing new research frames and management models to promote the sustainable development of the construction industry.


Sign in / Sign up

Export Citation Format

Share Document