scholarly journals Adaptive Real-Time Scheduling for Soft Tasks with Varying Execution Times

2014 ◽  
Vol 22 (2) ◽  
pp. 152-159
Author(s):  
Kiyofumi Tanaka
2005 ◽  
Vol 2005 (4) ◽  
pp. 225-240
Author(s):  
K. Subramani

The problem of partially clairvoyant scheduling is concerned with checking whether an ordered set of jobs, having nonconstant execution times and subject to a collection of imposed constraints, has a partially clairvoyant schedule. Variability of execution times of jobs and nontrivial relationships constraining their executions, are typical features of real-time systems. A partially clairvoyant scheduler parameterizes the schedule, in that the start time of a job in a sequence can depend upon the execution times of jobs that precede it, in the sequence. In real-time scheduling, parameterization of the schedule plays an important role in extending the flexibility of the scheduler, particularly in the presence of variable execution times. It has been shown that the existence of partially clairvoyant schedules can be determined in polynomial time, when the constraints are restricted to be “standard,” that is, relative timing constraints. In this paper, we extend the class of constraints for which partially clairvoyant schedules can be determined efficiently, to include aggregate constraints. Aggregate constraints form a strict superset of standard constraints and can be used to model performance metrics.


2021 ◽  
Author(s):  
Antoine Bertout ◽  
Joël Goossens ◽  
Emmanuel Grolleau ◽  
Roy Jamil ◽  
Xavier Poczekajlo

2021 ◽  
Vol 13 (6) ◽  
pp. 3400
Author(s):  
Jia Ning ◽  
Sipeng Hao ◽  
Aidong Zeng ◽  
Bin Chen ◽  
Yi Tang

The high penetration of renewable energy brings great challenges to power system operation and scheduling. In this paper, a multi-timescale coordinated method for source-grid-load is proposed. First, the multi-timescale characteristics of wind forecasting power and demand response (DR) resources are described, and the coordinated framework of source-grid-load is presented under multi-timescale. Next, economic scheduling models of source-grid-load based on multi-timescale DR under network constraints are established in the process of day-ahead scheduling, intraday scheduling, and real-time scheduling. The loads are classified into three types in terms of different timescale. The security constraints of grid side and time-varying DR potential are considered. Three-stage stochastic programming is employed to schedule resources of source side and load side in day-ahead, intraday, and real-time markets. The simulations are performed in a modified Institute of Electrical and Electronics Engineers (IEEE) 24-node system, which shows a notable reduction in total cost of source-grid-load scheduling and an increase in wind accommodation, and their results are proposed and discussed against under merely two timescales, which demonstrates the superiority of the proposed multi-timescale models in terms of cost and demand response quantity reduction.


Sign in / Sign up

Export Citation Format

Share Document