scholarly journals Administrative System for the Recycling of Wastes on Construction Site

1997 ◽  
Vol 5 ◽  
pp. 145-152
Author(s):  
Tadashi Nitta ◽  
Tsunemi Watanabe ◽  
Tsuneaki Yoshida ◽  
Masahiko Kunishima
2018 ◽  
pp. 106-126
Author(s):  
O. V. Anchishkina

The paper deals with a special sector of public procurement — G2G, in which state organizations act as both customers and suppliers. The analysis shows the convergence between contractual and administrative relations and risks of transferring the negative factors, responsible for market failures, into the administrative system, as well as the changing nature of the state organization. Budget losses in the sector G2G are revealed and estimated. There are doubts, whether the current practice of substitution of market-based instruments for administrative requirements is able to maintain integrity of public procurement in the situation of growing strategic challenges. Measures are proposed for the adjustment and privatization of contractual relations.


Author(s):  
Dan Xin

The effective construction of safety monitoring system at construction site depends on perfect management system and advanced technical support. And the lack of information technology platform, resulting in reduced management efficiency, information is not accurate and other issues. Based on the construction site safety monitoring system to achieve the goal, to do a good job in advance prevention, to take the latest information collection technology RFID and BIM integrated comprehensive and effective monitoring of the construction site, constitute the main technology in the monitoring system, thus ensuring the construction site safety monitoring efficiency , Comprehensive, real-time, etc., on the management and technical two points to achieve the construction site safety monitoring, improve the quality of safety management.


Sign in / Sign up

Export Citation Format

Share Document