Planning and Scheduling of High-Rise Building using Primavera

Author(s):  
Pranav Tawale
2005 ◽  
Vol 90 (5) ◽  
pp. 42-48
Author(s):  
Predrag L. Popovic ◽  
Richard C. Arnold
Keyword(s):  

2017 ◽  
Vol 55 (6) ◽  
pp. 523-528
Author(s):  
T. Ninomiya ◽  
M. Sugimura ◽  
Y. Yoshino ◽  
T. Komuro

Sign in / Sign up

Export Citation Format

Share Document