Factors Affecting Performance and Time Extension of ongoing Construction Projects under Town Development Fund, Nepal

Author(s):  
Anjay Kumar Mishra ◽  
2021 ◽  
Vol 4 (2) ◽  
pp. 62-66
Author(s):  
Abdul Qadir Memon ◽  
Aftab Hameed Memon ◽  
Mohsin Ali Soomro

Construction time and cost are basic parameters for measuring project performance. Unfortunately, construction projects are facing poor time and cost performance globally. This poor performance is occurred due to several factors among which resource related factors play very important role. Hence, it is very essential to control the factors affecting performance of time and cost. This study assessed significance level of the resource related factors and determined effective measure to mitigate the factors. Gathering of data was done by questionnaire survey with the practitioners representing client, consultant and contractors involved in handling execution works. Statistical analysis of gathered responses revealed that High cost of machinery and its maintenance; and fluctuation of prices of materials on site are significant resource related factors affecting project cost performance while in affecting time performance, the significant factors are financial difficulties faced by contractors and high cost of machinery and its maintenance. This study also assessed the effectiveness level of the mitigation measures for improving time and cost performance. The findings of this study will be helpful for the practitioners to make necessary arrangement for improving time and cost performance.


Author(s):  
Ahmed Salem Ahmed Marey Alhammadi ◽  
◽  
Aftab Hameed Memon ◽  

UAE construction industry frequently faces poor cost performance which commonly known as cost overrun problem. This problem is resulted from several factors and it is important to identify these cost overrun factors in order to avoid and minimize it. Hence, this paper focused on determined the relevancy of factors affecting cost performance in construction projects of UAE. Through a review of past research works conducted globally, 27 factors of cost overrun were listed and used for developing a structured questionnaire. A survey was conducted with 33 practitioners from client, consultant and contractors organizations involved in handling construction projects in UAE. The respondents were requested to state their perception regarding the relevancy of each of the factors that was perceived in context with cost overrun issue using 5-points Likert scale. The responses were analysed using average index method and the results found that all the 27 factors are relevant with construction industry of UAE in causing cost overrun. These factors can be used for further investigation to uncover critical problems of cost overrun.


2021 ◽  
Vol 8 (1) ◽  
pp. 1918848
Author(s):  
Nguyen Van Tam ◽  
Tran Ngoc Diep ◽  
Nguyen Quoc Toan ◽  
Nguyen Le Dinh Quy

Author(s):  
Ermias Andargie Walelgne ◽  
Setala Kim ◽  
Vaibhav Bajpai ◽  
Stefan Neumeier ◽  
Jukka Manner ◽  
...  

2005 ◽  
Vol 06 (01) ◽  
pp. 91-106 ◽  
Author(s):  
FLORENCE YEAN YNG LING

Sign in / Sign up

Export Citation Format

Share Document