scholarly journals Modelling Integrated Risks of Overseas Power Construction Project : A Case Study in Uzbekistan

2016 ◽  
Vol 9 (4) ◽  
pp. 90-97 ◽  
Author(s):  
Z. Shi ◽  
◽  
Z. Huang ◽  
X. Zhu ◽  
J. Liu ◽  
...  
2013 ◽  
Vol 405-408 ◽  
pp. 3437-3441
Author(s):  
Hong Ke ◽  
Chuan Wang ◽  
Gao Feng Luo

The selection of caculation method of the artificial man-days unit price of power construction projects is the focus and hotspot problem of the parties of power construction project and cost management departments. With domestic typical provinces, cities, and industry as the research object, this paper carried out case study and comprehensive analysis of three typical estimate methods of the basic principle, characteristics, application scope etc. The paper gives reference for the selection of estimate method of artificial man-days unit price of power construction project and this research conclusion to estimate method has strong pertinence and guidance.


2003 ◽  
Vol 3 (2) ◽  
pp. 79-91
Author(s):  
Florence Yean Yng Ling ◽  
Mohammed Fadhil Dulaimi ◽  
Mohan Kumaraswamy ◽  
Arun Bajracharya

2019 ◽  
Vol 2 ◽  
pp. 21-36
Author(s):  
Grażyna Gawrońska ◽  
◽  
Krzysztof Gawroński ◽  
Karol Król ◽  
Hubert Buzowski ◽  
...  

Sign in / Sign up

Export Citation Format

Share Document