Methods for Computing Minimum-Time Paths in Strong Winds

Author(s):  
Matthew Jardin ◽  
Arthur Bryson
Keyword(s):  
2012 ◽  
Vol 35 (1) ◽  
pp. 165-171 ◽  
Author(s):  
Matt R. Jardin ◽  
Arthur E. Bryson
Keyword(s):  

2019 ◽  
Vol 49 (1) ◽  
pp. 135-150
Author(s):  
Diane Negra

In this article I consider how registers of weather media carry/convey cultural information, specifically how texts about extreme weather articulate with investment in a supposed post-recession restored normality marked by the Irish government's commitment to deregulated transnational capitalism. I maintain that, in a process of cross-cultural remediation, sensationalist codes of US weather media that discursively manage awareness of systemic climate problems are just starting to infiltrate the Irish broadcasting environment. In early December 2015 RTÉ’s Teresa Mannion covered a strong gale, Storm Desmond, amidst inclement conditions in Salthill, Co Galway. Modelling the kind of ‘body at risk’ coverage consummately performed by US Weather Channel personnel, Mannion could barely speak over the lashing rain and strong winds in a dramatic broadcast that quickly became a viral video. This article analyses the fascination with Mannion's piece and its memetic, and attends to the nature of the pleasure taken in her on-camera discomfiture and the breach of gendered territory committed by Mannion at a time when national popular culture in Ireland is under increased obligation to identify and explain climate change-related extreme weather.


2020 ◽  
Vol 4 (02) ◽  
pp. 34-45
Author(s):  
Naufal Dzikri Afifi ◽  
Ika Arum Puspita ◽  
Mohammad Deni Akbar

Shift to The Front II Komplek Sukamukti Banjaran Project is one of the projects implemented by one of the companies engaged in telecommunications. In its implementation, each project including Shift to The Front II Komplek Sukamukti Banjaran has a time limit specified in the contract. Project scheduling is an important role in predicting both the cost and time in a project. Every project should be able to complete the project before or just in the time specified in the contract. Delay in a project can be anticipated by accelerating the duration of completion by using the crashing method with the application of linear programming. Linear programming will help iteration in the calculation of crashing because if linear programming not used, iteration will be repeated. The objective function in this scheduling is to minimize the cost. This study aims to find a trade-off between the costs and the minimum time expected to complete this project. The acceleration of the duration of this study was carried out using the addition of 4 hours of overtime work, 3 hours of overtime work, 2 hours of overtime work, and 1 hour of overtime work. The normal time for this project is 35 days with a service fee of Rp. 52,335,690. From the results of the crashing analysis, the alternative chosen is to add 1 hour of overtime to 34 days with a total service cost of Rp. 52,375,492. This acceleration will affect the entire project because there are 33 different locations worked on Shift to The Front II and if all these locations can be accelerated then the duration of completion of the entire project will be effective


Sign in / Sign up

Export Citation Format

Share Document