Malaysia Integrated Rig Sequence - The Benefits and Challenges

2021 ◽  
Author(s):  
Abdul Aziz Abd Wahab ◽  
Syamsul Ariffin M Ramli ◽  
Long M Long M Noor Affendi ◽  
Mee Yee Heong

Abstract Based on the data of drilling rigs working in Malaysia from 2014 to 2020 as per shown below, it can be concluded that, historically the demand for rig in Malaysia is very dynamic and it was influenced by mainly the brent price albeit a delayed impact. The red line showed the Brent Price. With the dynamic of the demand, a systematic and well-organized methodology to develop an integrated rig sequence was essential. It is to ensure all rigs were planned accordingly and successfully acquire in time to ensure the projects can be executed as per expectation. A glimpse on the outcome of having an integrated planning between all the parties related such as host authority, project planners, procurement team, and rig planning team together with a right tool is essential to sequence and plan the projects and the drilling rigs requirement.

1994 ◽  
Vol 144 ◽  
pp. 421-426
Author(s):  
N. F. Tyagun

AbstractThe interrelationship of half-widths and intensities for the red, green and yellow lines is considered. This is a direct relationship for the green and yellow line and an inverse one for the red line. The difference in the relationships of half-widths and intensities for different lines appears to be due to substantially dissimilar structuring and to a set of line-of-sight motions in ”hot“ and ”cold“ corona regions.When diagnosing the coronal plasma, one cannot neglect the filling factor - each line has such a factor of its own.


2020 ◽  
Vol 6 (1) ◽  
pp. 1
Author(s):  
Kuswanto Kuswanto ◽  
Juan Junius ◽  
Anita Christine Sembiring

Facility layout is integrated planning of the flow of a product in an operating system to obtain the most effective and efficient interrelation between workers, materials, machinery, and equipment as well as handling and transferring materials. A company engaged in furniture manufacturing has a problem in its production process, namely, the distance between machines is too far so that it affects the cost of handling materials. Distant workstations are found on profile machines, milling machines, measuring machines, cutting machines. Therefore, improvements must be made to the layout of facilities on the production floor so that facility layout is efficient and material handling costs are reduced. The problem-solving approach used is the Graph Method and CRAFT Algorithm. The results of the research show that material handling costs are reduced by 7.58% or Rp. 17,765 using the CRAFT algorithm.


Author(s):  
Todd Decker

Hymns for the Fallen listens closely to forty years of Hollywood combat films produced after Vietnam. Ever a noisy genre, post-Vietnam war films have deployed music and sound to place the audience in the midst of battle and to stimulate reflection on the experience of combat. Considering landmark movies—such as Apocalypse Now, Saving Private Ryan, The Thin Red Line, Black Hawk Down, The Hurt Locker, and American Sniper—as well as lesser known films, Todd Decker shows how the domain of sound, an experientially rich, culturally resonant aspect of the cinema, not only invokes the realities of war, but also shapes the American audience’s engagement with soldiers and veterans as flesh-and-blood representatives of the nation. Hymns for the Fallen explores all three elements of film sound—dialogue, sound effects, music—and considers how expressive and formal choices on the soundtrack have turned the serious war film into a patriotic ritual enacted in the commercial space of the cinema.


Sign in / Sign up

Export Citation Format

Share Document